Liaobin Submarine/Offshore Pipeline Post-Trenching Project (Year 2016)
Project Introduction:9.4km submarine/offshore pipeline post-trenching.
Other supplier products
|
Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/Subsea Production Platform A1,A2, Design, Fabrication and Site Installation |
Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/A1,A2, Design, Fabrication and Site Installation
Project Introduction:Jacket leg was ser... |
|
JZ9-3 Oil Field Platform Anti-Icing Design, Fabrication and Installation (Year 2009) |
Project Introduction:JZ9-3 oil field Jacket anti-icing destroyed seriously.
Work Scopeof :Structure re-design, fabrication, site installation, c... |
|
Liaobin Development Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2016) |
Liaobin Development Area Submarine/(Year 2016)
Project Introduction:The designed drainage quantity is 50,000 m3/d, subsea pipeline total length 9... |
|
Floating Hose Inspection, Displace, Installation |
Timeast performed many CNOOC QHD32-6、CFD11-2 and JZ9-3 offshore oil fieldfloating inspection and displacement project. |
|
Huludao Island & Juehuadao Island Water Supply Pipeline Project (Year 2017.10) |
Huludao Island & Juehuadao Island (Year 2017.10)
Project Introduction:This project is water supplying from land to offshore island.Pipeline t... |
All supplier products
Same products