.

120 ton 150 ton bridge erecting building construction

Product Description

120 ton 150 ton bridge erecting building construction is used in the erection of precast beam bridges for span by span method of construction for precast beam girders like T beam, U beam, etc. This self-beam launcher is suitable for bridge construction over river, valley or highway and so on.
120 ton 150 ton bridge erecting building construction is suitable for the construction of bridge for roads, railways and other bridge erection construction site. Its main function is to lift the prefabricated beams, then transported onto the prefabricated pier. 120 ton 150 ton bridge erecting building construction has big difference from the general cranes. It requests high security.

Our advantages:
A. More than 50 R&D personnels with advanced Science and technology
B. More than 400 sets advanced Production processing equipment and inspection equipment
C. Independent intellectual property rights to develop energy saving bridge cranes, gantry cranes, and electric hoist
E. Obtain ISO 9001 certificate and more than 10 series of patent certificates
F. Efficient service and competitive products
G. Export more than 100 countries

Packing
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying;
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.

Delivery
1.If the size of 120 ton 150 ton bridge erecting building construction are suitable for container ship, usually by container;
2.If the size is too big, usually by bulk ship or by container after truncation; Transport ways are based on reducing cost for you and keep the crane performance.

Delivery time
Within 30 to 40 working days after the receipt of deposit.

Transportation
Generally 35 days to 50 days to destination port.

FAQ

1.What’stheinformationshouldIprovidewheninquiry about the beam launcher?
1.1 We need the Bridge Drawing;the Maximum longitudinal slope and the Maximum Transverse slope;
1.2 The Girder/beam drawing;
2.What are inspection standard for load test of120 ton 150 ton bridge erecting building construction?
2.1. Dynamic load test
1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overheat.
2.2. Static load test
1.25times rated load, all mechanisms work well, the crane stops 20-30min as trial load is lifted 10cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation;
3.How to make highway bridge concrete girders?
a. Full span prefabrication,
b. Segment girder prefabrication
c. Full span cast-in-place girder
d. Segment cast-in-situ


在线联系供应商

至: Huada Heavy Industry
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

beam launcher bridge building equipment
beam launcher bridge building equipment Beam LauncherMain Features ◆ The beam Launcher has many advantages, such as light weight, high stiffness, low deflection, and high wind-resistance...
120 ton drawing customized double girder beam launcher bridge erecting machine
120 ton drawing customized double girder beam launcher bridge erecting machine 120 ton drawing customized double girder beam launcher bridge erecting machine applied to the construction of the highway. The highway bridge erect...
50t quay crane double girder container gantry crane for sale
50t quay crane double girder container gantry crane for sale Product Application 50t quay crane double girder container gantry cranealso called STS (ship to shore) crane, which isakindofhoistingmachine...
公路悬挑箱梁桥采用过梁系统
公路悬挑箱梁桥采用过梁系统 产品描述 公路悬挑箱梁桥采用过梁系统 采用平衡悬臂施工方法。公路悬臂箱梁桥采用的形式是行人系统,比悬挂模型更容易使用。而且它更容易被修改以供将来使用。我国公路悬臂箱梁桥采用的形式行走系统具有良好的模块化连接质量,为今后的改造和多年的重复使用而设计。我们提供优质的金属模板。我们也提供胶合板模板系...
railway suspension bridge erecting beam launcher crane 180t 200t
railway suspension bridge erecting beam launcher crane 180t 200t railway suspension bridge erecting beam launcher crane 180t 200tis used in the erection of precast beam bridges for span by span method of construc...
供应产品

Same products

1.22*1.22m Panel HDG Water Tank
1.22*1.22m Panel HDG Water Tank 卖方: shijiazhuang Kaixuan Victor Technology Co.,Ltd The1.22*1.22m Panel HDG Water Tank, also known as a Hot Dip Galvanized Water Tank or Pressed Stee...
High Strength SMC Molded Water Tank
High Strength SMC Molded Water Tank 卖方: shijiazhuang Kaixuan Victor Technology Co.,Ltd The High Strength SMC Molded Water Tank, also widely known as a GRP Water Tank, FRP water tank, o...
Glass Wool Board With Facing
Glass Wool Board With Facing 卖方: HEBEI LIANGPENG NEW MATERIAL CO.,LTD Glass Wool Board With Facing What is Glass Wool Board With Facing? Glass Wool BoardWith Facing ...
Brown Formaldehyde-Free Glass Wool Blanket
Brown Formaldehyde-Free Glass Wool Blanket 卖方: HEBEI LIANGPENG NEW MATERIAL CO.,LTD Brown Formaldehyde-Free Glass Wool Blanket Brown formaldehyde-free glass wool blanketis eco-frie...
Glass Wool Blanket With Polypropylene Foil
Glass Wool Blanket With Polypropylene Foil 卖方: HEBEI LIANGPENG NEW MATERIAL CO.,LTD Glass Wool Blanket With Polypropylene Foil What is Glass Wool Blanket With Polypropylene Facin...