300 ton bridge erecting cranes beam launcher machine for subway bridge construction
Product Description
300 ton bridge erecting cranes beam launcher machine
300 ton bridge erecting cranes beam launcher machineis used in the erection of precast beam bridges for span by span method of construction for precast beam girders like T beam, U beam, etc. This self-beam launcher is suitable for bridge construction over river, valley or highway and so on.
300 ton bridge erecting cranes beam launcher machineis suitable for the construction of bridge for roads, railways and other bridge erection construction site. Its main function is to lift the prefabricated beams, then transported onto the prefabricated pier. It has big difference from the general cranes. It requests high security.
Packing
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying.
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.
Delivery
1. If the size of300 ton bridge erecting cranes beam launcher machineare suitable for container ship, usually by container.
2. If the size is too big, usually by bulk ship or by container after truncation; Transport ways are based on reducing cost for you and keep the crane performance.
Delivery time
Within 30 to 40 working days after the receipt of deposit.
Transportation
Generally 35 days to 50 days to destination port.
FAQ
1. What’stheinformationshouldIprovidewheninquiry about the300 ton bridge erecting cranes beam launcher machine?
1.1 We need the Bridge Drawing, the Maximum longitudinal slope and the Maximum Transverse slope.
1.2 The Girder/beam drawing.
2.What are inspection standard for load test of 300 ton bridge erecting cranes beam launcher machine?
2.1 Dynamic load test
1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overheat.
2.2 Static load test
1.25 times rated load, all mechanisms work well, the crane stops 20-30 min as trial load is lifted 10 cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation;
3. How to make highway bridge concrete girders?
a. Full span prefabrication.
b. Segment girder prefabrication.
c. Full span cast-in-place girder.
d. Segment cast-in-situ.
4. How about maintenance of 300 ton bridge erecting cranes beam launcher machine?
4.1 Lubricating: Working performance and service life of all mechanisms of crane depend on lubricating to a big extent.
4.2 Steel wire rope: Fracture of wire has to be specially noticed. A new steel wire rope has to be changed immediately with the condition of broken wire, broken strands and wear loss to scrapping standard.
4.3 Spreader: The spreader has to be checked regularly.
4.4 Pulley block: Mainly check rope race wearing condition, check whether wheel flange is cracked and whether pulley could get stuck in the axle or not.
4.5 Wheels: Regularly check wheel flange and tread, a new wheel has to be immediately replaced as crack part or wearing in wheel flange reaches 10% of wheel thickness; Re-polishing has to be done as diameters between two driving wheels on tread differs more than D/600, or there are severe scar on the tread.
4.6 Brake: Check one time per shift; The brake should be in accurate movement, and pins do not allow to be stuck. Brake shoes shall fit brake wheels correctly; the brake shoes interval shall be equal to open them.
5. How many Personnel and equipment to assemble 300 ton bridge erecting cranes beam launcher machinein the worksite we need?
Personnel: 8 to 10 workers equipment
Truck crane > 50 t : 2 sets
Φ19.5 steel wire rope 8 m: 4 ropes
Sleepers: several
Electric welding machine: 1 set
Oxygen, acetylene: 1 set
Hammer(12 pound and 8 pound): 1 set for each
Wrench and pincher: several
Gradienter: 1 set
在线联系供应商
Other supplier products
| 船厂码头集装箱龙门起重机端梁150吨 | 产品描述 产品应用 船厂150吨码头集装箱龙门起重机端梁又称STS(船到岸)起重机,是码头专用的起重机械,具有装卸集装箱船舶的快速性。本船厂码头集装箱龙门起重机端梁150吨,主要由龙门结构、吊杆、小车、起重机行走机构、吊杆提升系统、移动驾驶室、机房、吊具、电气设备等必要的安全辅助设备组成。 船... | |
| 装配300吨吊装移动脚手架系统,用于桥梁施工 | 产品描述 高架和悬挂式MSS都由一个自支撑结构和一个特定于项目的外部模板组合而成。该装配式300吨吊装活动脚手架体系可方便地适应从双T到单箱、跨度从20米到70米不等的截面。 多年来,为降低我国建筑施工人员的高成本,研制开发了300吨桥下吊装移动式脚手架系统。今天,我们的现浇桥梁MSS可以为您... | |
| 1吨遥控钢丝绳低扬程电动葫芦 | 1吨遥控钢丝绳低扬程电动葫芦是目前最流行的单梁架空藤用葫芦,具有结构紧凑、机身智能、安全可靠、常用部件、性能多变、起重能力强、维修方便等特点。1吨遥控钢丝绳低扬程电动葫芦也可通过固定在工字梁上工作。这是一种轻型设计。 1吨遥控钢丝绳低扬程电动葫芦的安全是最重要的问题。为确保安全,我们安装了以下... | |
| 重型龙门起重机100吨带安全锁扣吊钩 | 产品描述 100吨带安全锁扣的重型门式起重机通常配有安全锁扣,以防止负载所附的起重钢丝绳吊索、链条或绳索脱离。100吨带安全锁扣的重型龙门起重机吊钩按外形可分为单钩和双钩,按生产方法可分为锻造吊钩和铸造吊钩。吊钩是连接起重机和起重机重量的纽带,起着至关重要的作用,必须重视对它的维护。重型龙门起... | |
| 新设计的吊艇起重机游艇装卸机吊艇龙门起重机 | 产品描述 新设计的吊艇起重机游艇装卸机吊艇龙门起重机 新设计船起重机游艇处理机器船起重龙门起重机应用外部仓库或铁路侧共同提升和卸货工作,新设计船起重机游艇处理机器船起重龙门起重机桥组成,支撑腿,大车运行机制,电车,电气设备,起重绞车,框架采用框或桁架焊接类型机制,大车运行机制是在司机室或遥控操... |
Same products
| 1.22*1.22m Panel HDG Water Tank | 卖方: shijiazhuang Kaixuan Victor Technology Co.,Ltd | The1.22*1.22m Panel HDG Water Tank, also known as a Hot Dip Galvanized Water Tank or Pressed Stee... | |
| High Strength SMC Molded Water Tank | 卖方: shijiazhuang Kaixuan Victor Technology Co.,Ltd | The High Strength SMC Molded Water Tank, also widely known as a GRP Water Tank, FRP water tank, o... | |
| Glass Wool Board With Facing | 卖方: HEBEI LIANGPENG NEW MATERIAL CO.,LTD | Glass Wool Board With Facing What is Glass Wool Board With Facing? Glass Wool BoardWith Facing ... | |
| Brown Formaldehyde-Free Glass Wool Blanket | 卖方: HEBEI LIANGPENG NEW MATERIAL CO.,LTD | Brown Formaldehyde-Free Glass Wool Blanket Brown formaldehyde-free glass wool blanketis eco-frie... | |
| Glass Wool Blanket With Polypropylene Foil | 卖方: HEBEI LIANGPENG NEW MATERIAL CO.,LTD | Glass Wool Blanket With Polypropylene Foil What is Glass Wool Blanket With Polypropylene Facin... |