.

Sinochem Quanzhou PetroChemical Submarine/Offshore Cable Laying (Year 2013)

Project Introduction:2 subsea pipelines total length 13km, 35kv.

Tianjin Timeast Offshore Engineering Co., Ltd. was registered in Tianjin TEDA in January 2002 (former name is Tianjin TEDA Timeast Offshore Equipment Co., Ltd. Timeast for short hereinafter). There are 75 employees, including 54 technicians, 3 senior engineers, 5 constructors, 8 associate constructors. Timeast owns 601 pipeline laying barge and SE-12000 pre/post trenching excavator etc. nearly 40 sets of large scale and professional engineering equipments.

Timeast focuses on submarine/offshore engineering business from the foundation, through years of efforts, our footprint spread all over the sea areas in China and also in Africa and Asia such as Indonesia, Philippines, Vietnam, Bangladesh, Thailand, Malaysia, Kenya and Tanzania etc. If you are interested in our service, please feel free to contact us.



Отправить запрос, связаться с поставщиком

Кому: Tianjin Timeast Offshore Engineering Co., Ltd.
Ваш E-mail:
Текст письма:


Send to other suppliers

Другие товары поставщика

Liaobin Development Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2016)
Liaobin Development Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2016) Liaobin Development Area Submarine/(Year 2016) Project Introduction:The designed drainage quantity is 50,000 m3/d, subsea pipeline total length 9...
Roc Oil Zhaodong Oil Field Cable Repairing (Year 2012)
Roc Oil Zhaodong Oil Field Cable Repairing (Year 2012) Project Introduction: Subsea cable of P4-CEP and P3-CEP broke need to be repaired emergently. Work Scope:, fault point searching and checking, c...
CNOOC Indonesia SES Gas Submarine/Offshore Pipeline Landing Project (Year 2005)
CNOOC Indonesia SES Gas Submarine/Offshore Pipeline Landing Project (Year 2005) CNOOC Indonesia SES Gas Submarine/(Year 2005) Project Introduction:CNOOC Indonesia SES gas submarine/offshore pipeline landing project. Work Scop...
Ma Mu & Yu Shan Islands Submarine/Offshore Pipelines Installation Project (Year 2018)
Ma Mu & Yu Shan Islands Submarine/Offshore Pipelines Installation Project (Year 2018) Project Introduction:Horizontal pipelifting; Inclined riser integrally lifting and overall lower down work after tie-in; Two crude oil submarin...
JZ9-3 Oil Field Platform Anti-Icing Design, Fabrication and Installation (Year 2009)
JZ9-3 Oil Field Platform Anti-Icing Design, Fabrication and Installation (Year 2009) Project Introduction:JZ9-3 oil field Jacket anti-icing destroyed seriously. Work Scopeof :Structure re-design, fabrication, site installation, c...
Все товары поставщика

Похожие товары

LF05A Oxygen Generator
LF05A Oxygen Generator Продавец: Lepu Medical Technology(Beijing)Co.,Ltd Large-screen display Built-in water tank Remote control With an atomizing function Up...
HF2-P400V220 High Voltage Dual White Dimming LED Driver
HF2-P400V220 High Voltage Dual White Dimming LED Driver Продавец: FUTLIGHT OPTOELECTRONICS CO.,LIMITED HF2-P400V220 High Voltage Dual LED Driver • 2.4G RF Remote controllable • 16 Million...
FUT035W Dual White LED Controller (WiFi+2.4G)
FUT035W Dual White LED Controller (WiFi+2.4G) Продавец: FUTLIGHT OPTOELECTRONICS CO.,LIMITED FUT035W Dual White LED Smart Controller(WiFi+2.4G) • Support “Tuya Smart” app ...
FUT035M Dual White LED Controller (2.4GHz)
FUT035M Dual White LED Controller (2.4GHz) Продавец: FUTLIGHT OPTOELECTRONICS CO.,LIMITED FUT035M Dual White LED Controller (2.4GHz) • 2.4G RF wireless transmission technology &...
FUT089 8-Zone RGB+CCT Remote
FUT089 8-Zone RGB+CCT Remote Продавец: FUTLIGHT OPTOELECTRONICS CO.,LIMITED FUT089 8-Zone RGB+CCT Remote • 2.4G RF wireless transmission technology • It can con...