Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/Subsea Production Platform A1,A2, Design, Fabrication and Site Installation

Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/A1,A2, Design, Fabrication and Site Installation

Project Introduction:Jacket leg was seriously destroyed by ice fluent in winter, the new bumper breaks every year.

Work Scope:To solve the problem completely, Timeast re-design the structure, calculation and structure fabrication, offshore/subsea installation.



Отправить запрос, связаться с поставщиком

Кому: Tianjin Timeast Offshore Engineering Co., Ltd.
Ваш E-mail:
Текст письма:


Send to other suppliers

Другие товары поставщика

Zhaodong Oil Submarine/Offshore Pipeline Post-Trenching Project (Year 2010)
Zhaodong Oil Submarine/Offshore Pipeline Post-Trenching Project (Year 2010) Zhaodong Oil Submarine/(Year 2010) Project Introduction:1.7km submarine/offshore pipeline post-trenching.
Huludao Submarine/Offshore Optical Cable Laying (Year 2017)
Huludao Submarine/Offshore Optical Cable Laying (Year 2017) Project Introduction:Approximate 13km submarine/offshore cable laying (including landing installation at both ends) , submarine/offshore cable c...
Liaobin Development Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2016)
Liaobin Development Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2016) Liaobin Development Area Submarine/(Year 2016) Project Introduction:The designed drainage quantity is 50,000 m3/d, subsea pipeline total length 9...
Tincy Energy Group Yuedong Oil Field Submarine/Offshore Cable Repairing (Year 2014)
Tincy Energy Group Yuedong Oil Field Submarine/Offshore Cable Repairing (Year 2014) Project Introduction:Yuedong Oil Field, A and B cable between island and onshore broke, need to be repaired emergently. Work Scope:, fault point...
Ma Mu & Yu Shan Islands Submarine/Offshore Pipelines Installation Project (Year 2018)
Ma Mu & Yu Shan Islands Submarine/Offshore Pipelines Installation Project (Year 2018) Project Introduction:Horizontal pipelifting; Inclined riser integrally lifting and overall lower down work after tie-in; Two crude oil submarin...
Все товары поставщика

Похожие товары

LF05A Oxygen Generator
LF05A Oxygen Generator Продавец: Lepu Medical Technology(Beijing)Co.,Ltd Large-screen display Built-in water tank Remote control With an atomizing function Up...
HF2-P400V220 High Voltage Dual White Dimming LED Driver
HF2-P400V220 High Voltage Dual White Dimming LED Driver Продавец: FUTLIGHT OPTOELECTRONICS CO.,LIMITED HF2-P400V220 High Voltage Dual LED Driver • 2.4G RF Remote controllable • 16 Million...
FUT035W Dual White LED Controller (WiFi+2.4G)
FUT035W Dual White LED Controller (WiFi+2.4G) Продавец: FUTLIGHT OPTOELECTRONICS CO.,LIMITED FUT035W Dual White LED Smart Controller(WiFi+2.4G) • Support “Tuya Smart” app ...
FUT035M Dual White LED Controller (2.4GHz)
FUT035M Dual White LED Controller (2.4GHz) Продавец: FUTLIGHT OPTOELECTRONICS CO.,LIMITED FUT035M Dual White LED Controller (2.4GHz) • 2.4G RF wireless transmission technology &...
FUT089 8-Zone RGB+CCT Remote
FUT089 8-Zone RGB+CCT Remote Продавец: FUTLIGHT OPTOELECTRONICS CO.,LIMITED FUT089 8-Zone RGB+CCT Remote • 2.4G RF wireless transmission technology • It can con...