Huludao Submarine/Offshore Optical Cable Laying (Year 2017)

Project Introduction:Approximate 13km submarine/offshore cable laying (including landing installation at both ends) , submarine/offshore cable connection at both ends, submarine/, hydrotesting work etc.High pressure hydraulic jet embedding machine (traction type) is adopted to carry out laying and burying at the same time. Bury depth is no less than 3 meters. By modification of equipment, Timeast met the construction quality requirements at one time and successfully completed the construction task, and achieved another breakthrough in technology.



Send product request

To: Tianjin Timeast Offshore Engineering Co., Ltd.
Your E-mail:
Message text:


Send to other suppliers

Other supplier products

Roc Oil Zhaodong Oil Field Cable Repairing (Year 2012)
Roc Oil Zhaodong Oil Field Cable Repairing (Year 2012) Project Introduction: Subsea cable of P4-CEP and P3-CEP broke need to be repaired emergently. Work Scope:, fault point searching and checking, c...
CFD11-2 Offshore/Subsea Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO (Year 2007-2008)
CFD11-2 Offshore/Subsea Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO (Year 2007-2008) CFD11-2 Offshore/, Repair and Installation between SPM and FPSO (Year 2007-2008) Project Introduction: -Jumper Hose Parameter: ø 24”...
Hebei Province CFD Chemical Industrial Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2017)
Hebei Province CFD Chemical Industrial Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2017) Hebei Province CFD Chemical Industrial Area Submarine/Offshore Pollution Drainage (Year 2017) Project Introduction:Onshore pipeline 0.2km, offsho...
Liaobin Development Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2016)
Liaobin Development Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2016) Liaobin Development Area Submarine/(Year 2016) Project Introduction:The designed drainage quantity is 50,000 m3/d, subsea pipeline total length 9...
Huludao Island & Juehuadao Island Water Supply Pipeline Project (Year 2017.10)
Huludao Island & Juehuadao Island Water Supply Pipeline Project (Year 2017.10) Huludao Island & Juehuadao Island (Year 2017.10) Project Introduction:This project is water supplying from land to offshore island.Pipeline t...
All supplier products

Same products

5G WiFi Wireless Router  D7341
5G WiFi Wireless Router D7341 Seller: Guangzhou DSPPA Audio Co., Ltd. 5G Wireless Router D7341 Adopt WPA / WPA2 digital encryption technology ensures conference pr...
4K DISTRIBUTION MATRIX SYSTEM  DIM002
4K DISTRIBUTION MATRIX SYSTEM DIM002 Seller: Guangzhou DSPPA Audio Co., Ltd. Integrated efficient environmental management module, which can control lighting, air conditionin...
4K 8x8 Audiovisual Matrix Switcher
4K 8x8 Audiovisual Matrix Switcher Seller: Guangzhou DSPPA Audio Co., Ltd. M4K08 Fully adopt FPGA programmable logic array for signal processing and full switching, in R...
4K 72x72 Audiovisual Matrix Switcher
4K 72x72 Audiovisual Matrix Switcher Seller: Guangzhou DSPPA Audio Co., Ltd. Fully adopt FPGA programmable logic array for signal processing and full switching, in RGB444 f...
4K 36x36 Audiovisual Matrix Switcher
4K 36x36 Audiovisual Matrix Switcher Seller: Guangzhou DSPPA Audio Co., Ltd. Fully adopt FPGA programmable logic array for signal processing and full switching, in RGB444 f...