Sinochem Quanzhou PetroChemical Submarine/Offshore Cable Laying (Year 2013)

Project Introduction:2 subsea pipelines total length 13km, 35kv.

Tianjin Timeast Offshore Engineering Co., Ltd. was registered in Tianjin TEDA in January 2002 (former name is Tianjin TEDA Timeast Offshore Equipment Co., Ltd. Timeast for short hereinafter). There are 75 employees, including 54 technicians, 3 senior engineers, 5 constructors, 8 associate constructors. Timeast owns 601 pipeline laying barge and SE-12000 pre/post trenching excavator etc. nearly 40 sets of large scale and professional engineering equipments.

Timeast focuses on submarine/offshore engineering business from the foundation, through years of efforts, our footprint spread all over the sea areas in China and also in Africa and Asia such as Indonesia, Philippines, Vietnam, Bangladesh, Thailand, Malaysia, Kenya and Tanzania etc. If you are interested in our service, please feel free to contact us.



在线联系供应商

至: Tianjin Timeast Offshore Engineering Co., Ltd.
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

Ma Mu & Yu Shan Islands Submarine/Offshore Pipelines Installation Project (Year 2018)
Ma Mu & Yu Shan Islands Submarine/Offshore Pipelines Installation Project (Year 2018) Project Introduction:Horizontal pipelifting; Inclined riser integrally lifting and overall lower down work after tie-in; Two crude oil submarin...
CNOOC LD Submarine/Offshore Pipeline Laying Project (Year 2004)
CNOOC LD Submarine/Offshore Pipeline Laying Project (Year 2004) Project Introduction:LD submarine/offshore pipeline laying project is part of CNOOC LD 5-2 oil field oil & gas development project. Wor...
Weizhou 12-2 Oilfield Phase Ⅱ Development Project (Year 2016)
Weizhou 12-2 Oilfield Phase Ⅱ Development Project (Year 2016) Project Introduction and Work Scope: Hydrotesting and spool installation for submarine/offshore . 4 sections, 45m pipeline cutting operation, pi...
Zhaodong Oil Submarine/Offshore Pipeline Post-Trenching Project (Year 2010)
Zhaodong Oil Submarine/Offshore Pipeline Post-Trenching Project (Year 2010) Zhaodong Oil Submarine/(Year 2010) Project Introduction:1.7km submarine/offshore pipeline post-trenching.
JZ9-3 Oil Field Platform Anti-Icing Design, Fabrication and Installation (Year 2009)
JZ9-3 Oil Field Platform Anti-Icing Design, Fabrication and Installation (Year 2009) Project Introduction:JZ9-3 oil field Jacket anti-icing destroyed seriously. Work Scopeof :Structure re-design, fabrication, site installation, c...
供应产品

Same products

CSA Binder
CSA Binder 卖方: OREWORLD TRADE(TANGSHAN) CO., LTD. CSA BinderIntroduction: Calcium Sulfoaluminate binder is pure CSA clinker that grinded without a...
Calcium Aluminate Cement
Calcium Aluminate Cement 卖方: OREWORLD TRADE(TANGSHAN) CO., LTD. Description of Calcium Aluminate Cement Calcium aluminate cement, alumina cements or high alumin...
Amorphous Calcium Aluminate
Amorphous Calcium Aluminate 卖方: OREWORLD TRADE(TANGSHAN) CO., LTD. Amorphous Calcium Aluminate Details: The mineral of amorphous calcium aluminate(non-crystalline ...
CSA Expansive Additive
CSA Expansive Additive 卖方: OREWORLD TRADE(TANGSHAN) CO., LTD. CSA expansive additive description: The CSA expansive additive is obtained by blending natural...
CSA Cement
CSA Cement 卖方: OREWORLD TRADE(TANGSHAN) CO., LTD. CSA (Calcium Sulfoaluminate Cement) cement is a special cement used in many applications where ea...