Tianjin Timeast Offshore Engineering Co., Ltd.

Контактная информация

Tianjin Timeast Offshore Engineering Co., Ltd.

Для того, чтобы связаться с поставщиком, необходимо авторизоваться или пройти регистрацию

Отправить запрос поставщику

Tianjin Timeast Offshore Engineering Co., Ltd. was registered in Tianjin
TEDA in January 2002 (former name is Tianjin TEDA Timeast Offshore
Equipment Co., Ltd. Timeast for short hereinafter). There are 75
employees, including 54 technicians, 3 senior engineers, 5 constructors, 8
associate constructors. Timeast owns 601 pipeline laying barge and SE-
12000 pre/post trenching excavator etc. nearly 40 sets of large scale and
professional engineering equipments.
Timeast focuses on submarine/offshore engineering business from the
foundation, through years of efforts, our footprint spread all over the sea
areas in China and also in Africa and Asia such as Indonesia, Philippines,
Vietnam, Bangladesh, Thailand, Malaysia, Kenya and Tanzania etc. If you
are interested in our service, please feel free to contact us.
Our domestic business partner including: CNOOC, Petro-China, Sino-Pec,
Tincy Engergy Group, Liaobin Development Area, Tianjin Water Works
(Group) Company Ltd. CFD Development Area, Energy China; the
overseas business partner including: Roc Oil, Hyundai Corporation,
CHIYODA, ConocoPhillips, KMG etc.
Timeast will continue to improve technology and develop market, put
safety and environment protection at the first place, provide high quality
and efficient service to client. Timeast expects deeper cooperation and
mutual success with you!

Our official whatsapp account is +86 .


Товары:

Boxi and Gaoshaling Oil & Gas Treatment Plant Pipeline Recovery Project (Year 2018)
Boxi and Gaoshaling Oil & Gas Treatment Plant Pipeline Recovery Project (Year 2018) Project Introduction: Abandoned 8”mixed transportation pipeline and 12” natural gas submarine/offshore pipeline of Boxi treatment pl...
Ma Mu & Yu Shan Islands Submarine/Offshore Pipelines Installation Project (Year 2018)
Ma Mu & Yu Shan Islands Submarine/Offshore Pipelines Installation Project (Year 2018) Project Introduction:Horizontal pipelifting; Inclined riser integrally lifting and overall lower down work after tie-in; Two crude oil submarin...
Weizhou 12-2 Oilfield Phase Ⅱ Development Project (Year 2016)
Weizhou 12-2 Oilfield Phase Ⅱ Development Project (Year 2016) Project Introduction and Work Scope: Hydrotesting and spool installation for submarine/offshore . 4 sections, 45m pipeline cutting operation, pi...
Tanzania Mnazi Bay Submarine/Offshore Pipeline Laying Project (Year 2014)
Tanzania Mnazi Bay Submarine/Offshore Pipeline Laying Project (Year 2014) Project Introduction:Part of gas pipeline crossing Mnazi Bay, shallow water area is 2.2km, total length is 16km. Work Scope:(float laying method...
Philippines 20MW [Net] Steam Turbine Genset Project (Year 2017-2018)
Philippines 20MW [Net] Steam Turbine Genset Project (Year 2017-2018) Project Introduction:20MW [Net] Steam Turbine Genset Project is located in Lafarge cement plant in Iligan, North Mindanao, Philippines. The cons...
Huludao Island & Juehuadao Island Water Supply Pipeline Project (Year 2017.10)
Huludao Island & Juehuadao Island Water Supply Pipeline Project (Year 2017.10) Huludao Island & Juehuadao Island (Year 2017.10) Project Introduction:This project is water supplying from land to offshore island.Pipeline t...
Hebei Province CFD Chemical Industrial Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2017)
Hebei Province CFD Chemical Industrial Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2017) Hebei Province CFD Chemical Industrial Area Submarine/Offshore Pollution Drainage (Year 2017) Project Introduction:Onshore pipeline 0.2km, offsho...
Liaobin Development Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2016)
Liaobin Development Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2016) Liaobin Development Area Submarine/(Year 2016) Project Introduction:The designed drainage quantity is 50,000 m3/d, subsea pipeline total length 9...
Huludao Submarine/Offshore Optical Cable Laying (Year 2017)
Huludao Submarine/Offshore Optical Cable Laying (Year 2017) Project Introduction:Approximate 13km submarine/offshore cable laying (including landing installation at both ends) , submarine/offshore cable c...
Tincy Energy Group Yuedong Oil Field Submarine/Offshore Cable Repairing (Year 2014)
Tincy Energy Group Yuedong Oil Field Submarine/Offshore Cable Repairing (Year 2014) Project Introduction:Yuedong Oil Field, A and B cable between island and onshore broke, need to be repaired emergently. Work Scope:, fault point...
Sinochem Quanzhou PetroChemical Submarine/Offshore Cable Laying (Year 2013)
Sinochem Quanzhou PetroChemical Submarine/Offshore Cable Laying (Year 2013) Project Introduction:2 subsea pipelines total length 13km, 35kv. Tianjin Timeast Offshore Engineering Co., Ltd. was registered in Tianjin TEDA i...
Roc Oil Zhaodong Oil Field Cable Repairing (Year 2012)
Roc Oil Zhaodong Oil Field Cable Repairing (Year 2012) Project Introduction: Subsea cable of P4-CEP and P3-CEP broke need to be repaired emergently. Work Scope:, fault point searching and checking, c...
CNOOC BN Submarine/Offshore Pipeline Landing Project (Year 2005)
CNOOC BN Submarine/Offshore Pipeline Landing Project (Year 2005) Project Introduction:BN 26-2 submarine/offshore pipeline landing project is part of CNOOC BN oil field development project. Work Scope:Site prep...
CNOOC Indonesia SES Gas Submarine/Offshore Pipeline Landing Project (Year 2005)
CNOOC Indonesia SES Gas Submarine/Offshore Pipeline Landing Project (Year 2005) CNOOC Indonesia SES Gas Submarine/(Year 2005) Project Introduction:CNOOC Indonesia SES gas submarine/offshore pipeline landing project. Work Scop...
CNOOC Panyu Submarine/Offshore Pipeline Landing Project (Year 2004)
CNOOC Panyu Submarine/Offshore Pipeline Landing Project (Year 2004) Project Introduction:Panyu submarine/offshore pipeline landing project is part of submarine pipeline of CNOOC Panyu oil field oil & gas d...
CNOOC LD Submarine/Offshore Pipeline Laying Project (Year 2004)
CNOOC LD Submarine/Offshore Pipeline Laying Project (Year 2004) Project Introduction:LD submarine/offshore pipeline laying project is part of CNOOC LD 5-2 oil field oil & gas development project. Wor...
JZ9-3 Oil Field Platform Anti-Icing Design, Fabrication and Installation (Year 2009)
JZ9-3 Oil Field Platform Anti-Icing Design, Fabrication and Installation (Year 2009) Project Introduction:JZ9-3 oil field Jacket anti-icing destroyed seriously. Work Scopeof :Structure re-design, fabrication, site installation, c...
Floating Hose Inspection, Displace, Installation
Floating Hose Inspection, Displace, Installation Timeast performed many CNOOC QHD32-6、CFD11-2 and JZ9-3 offshore oil fieldfloating inspection and displacement project.
CFD11-2 Offshore/Subsea Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO (Year 2007-2008)
CFD11-2 Offshore/Subsea Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO (Year 2007-2008) CFD11-2 Offshore/, Repair and Installation between SPM and FPSO (Year 2007-2008) Project Introduction: -Jumper Hose Parameter: ø 24”...
Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/Subsea Production Platform A1,A2, Design, Fabrication and Site Installation
Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/Subsea Production Platform A1,A2, Design, Fabrication and Site Installation Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/A1,A2, Design, Fabrication and Site Installation Project Introduction:Jacket leg was ser...
Liaobin Submarine/Offshore Pipeline Post-Trenching Project (Year 2016)
Liaobin Submarine/Offshore Pipeline Post-Trenching Project (Year 2016) Project Introduction:9.4km submarine/offshore pipeline post-trenching.
Yuedong Oil Submarine/Offshore Pipeline Post-Trenching Project (Year 2011-2012)
Yuedong Oil Submarine/Offshore Pipeline Post-Trenching Project (Year 2011-2012) Project Introduction:38km submarine/offshore pipeline post-trenching.
Zhaodong Oil Submarine/Offshore Pipeline Post-Trenching Project (Year 2010)
Zhaodong Oil Submarine/Offshore Pipeline Post-Trenching Project (Year 2010) Zhaodong Oil Submarine/(Year 2010) Project Introduction:1.7km submarine/offshore pipeline post-trenching.
Jidong Oil Field1-3 Island Submarine/Offshore Pipeline Post-Trenching Project (Year 2009)
Jidong Oil Field1-3 Island Submarine/Offshore Pipeline Post-Trenching Project (Year 2009) Jidong Oil Field1-3 Island Project (Year 2009) Project Introduction:16km submarine/offshore pipeline post-trenching.