50-300t Highway Bridge Beam Launcher Crane Incremental Launching Method
Bridge machine main operation content The installation work of the bridge erector mainly includes the positioning of the middle leg and the front leg (leveling, support, distance, etc.), and the main frame and guide Beam splicing, installation of temporary legs and tail legs, installation of beams on the front, middle and tail ends, installation of longitudinal travel cars, lifting trolleys, winding of hoisting ropes, installation of power supply systems and control systems, and commissioning of complete machines No-load, heavy-load test, handover, etc.
Другие товары поставщика
|
|
Marine Port Crane |
Welcome to consult marine port crane price and quotation with Henan Dowell Crane Co.,Ltd, which is one of the leading marine port crane manufacture... |
|
|
5t Single Girder Overhead Crane Hoist Quotation |
Welcome to consult 5t single girder overhead crane hoist quotation price and quotation with Henan Dowell Crane Co.,Ltd, which is one of the leading... |
|
|
|
A jib crane is a type of crane where a horizontal member (jib or boom),Website:, supporting a movable hoist, is fixed to a wall or to a floor-mount... |
|
|
|
Welcome to consult qz type double girder electric grab bucket bridge crane to lift scrap price and quotation with Henan Dowell Crane Co.,Ltd, whic... |
|
|
|
Welcome to consult straddle carrier for lifting container price and quotation with Henan Dowell Crane Co.,Ltd, which is one of the leading straddle... |
Все товары поставщика
Похожие товары