Application of Expansion shell anchor bolt for complex conditions
In certain situations with soild and fractured rock,intrusion of water,or required a pre-stress,it is necessary to loadanchor boltimmediately,SinorockExpansion shell anchor boltis a better solution.For corrosion protection and sealing off the instruding Expansion shellanchor bolt injected with grout.
Expansion shell anchor boltcan be used for permanent support in medium and good rock condition,espiecially in hard rock,rock horizontalbedding,groundwater development situation.It can be applied to prevent slope sliding ,rock bursting and constrution problem. 1.The operationis sample and convenient. 2.The product has active tension.The prestressing force is up to 50KN. 3.It can be operated by one person throughusing general tools. 4.The operator has full control in the installation process and constrution quality. Installation instruction 1.Drillingand clearing the hole.In order to have a straight and accurate hole,please use cross-cut drill bit. 2.Putting the anchor bar which hasinstalled expansion shell into the bottom of the hole. 3.Giving prestressing force to the anchor bar and making sure the expansion shellfully opened by using specialized tools until reach the design requirement. Expansion shell is very convenient and easy to install,it's suitstemporary support and permanent support.It matches with domed plate,nut and domed washer.And they are well suited for use in single or twingrout tube installation due to the minimal rotation the bar undergoes the setting process.
Send product request
Other supplier products
| Here the benefits of Sinorock soil nailing technology | The advantages of Sinorock’s technology can be applied to new permanent construction, temporary construction and to the restoration of exist... | |
| Sinorock soil nailing technlogy is mature | As with construction increasing,thesoil nailingtechnology is development.Soil nailing is a technique which is used to reinforce soil. It can be use... | |
| Soil nails are effective as temporary or permanent geostructural solutions | Designed to be installed horizontally or at a slight angle (20-25°), provide reinforcement for earth retention structures within excavations a... | |
| Sinorock has significant experience in soil nail | Sinorock has significant experience and know-how in the supply of materials, components, finished goods, specially designed/engineered equipment, a... | |
| Soil nails work by reinforcing the rock | Underground mining creates excavations of varying sizes in the surrounding rock mass. This rock mass is never continuous, can be of varying rock st... |
Same products
| smartcomfortledheater | Seller: smartcomfortledheater | 1. 24 hours timer(For5002L-Erp/5003L-Ērp);7.5hours timer(For 5002/5002L)2. Weekly timer (For 5002... | |
| Common Rail Fuel Injector Control Valve F00VC01543 Common Rail Fuel Injector Control Valve F00VC02246 | Seller: China lutong | Common Rail Fuel Injector Control Valve F00VC01543 Common Rail Fuel Injector Control Valve F00VC0... | |
| Potable Water Storage Tank | Seller: 854818 | Potable Water Storage Tank In strict accordance with the content of the international water safet... | |
| Nozzle Sprayer DLLZ157P964 Nozzle Sprayer DLLA148P2382+ | Seller: China lutong | Nozzle Sprayer DLLZ157P964 Nozzle Sprayer DLLA148P2382+Chris Whats/ app:+8–6–1&ndash... | |
| Nozzle Sprayer DLLA147PV3A005T5 Nozzle Sprayer DLLA147P27BJ | Seller: China lutong | Nozzle Sprayer DLLA147PV3A005T5 Nozzle Sprayer DLLA147P27BJChris Whats/ app:+8–6–1&n... |











