900 ton erection girder railway launching girder manufacturer for precast installation
Product Description
900 ton erection girder railway launching girder manufactureris generally used in the erection of the Highway Bridge and Subway Bridge, using the precast segmental prestress concrete box beam (PC beam) assembly. The main feature is the high efficiency of construction and self-traveling. Generally it is composed of the main beam, leg and winch trolley, the main girder is used for bearing, the leg is to execute machine transverse moving, longitudinal moving, leveling, support, cross span, cross scale and other functions, and the winch trolley used for lifting the precast girder.
Packing
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying;
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.
Delivery
1.If the size of 900 ton erection girder railway launching girder manufacturer are suitable for container ship, usually by container;
2.If the size is too big, usually by bulk ship or by container after truncation; Transport ways are based on reducing cost for you and keep the crane performance.
Delivery time
Within 30 to 40 working days after the receipt of deposit.
Transportation
Generally 35 days to 50 days to destination port.
FAQ
1.What’s the information should I provide when inquiry about the900 ton erection girder railway launching girder manufacturer?
a .we need the Bridge Drawing;the Maximum longitudinal slope and the Maximum Transverse slope;
b. The Girder/beam drawing;
2.How many Personnel and equipment to assemblelaunching gantryin the worksite we need?
Personnel: 8 to 10 workers equipment:
Truck crane>50t :2 sets
Φ19.5 steel wire rope 8m:4 ropes
Sleepers:several
Electric welding machine:1set
Oxygen, acetylene:1 set
Hammer(12pound and 8pound):1 set for each
Wrench and pincher:several
Gradienter:1set
3.What are inspection standard for load test of900 ton erection girder railway launching girder manufacturer?
a. Dynamic load test
1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overhead.
b. Static load test
1.25times rated load, all mechanisms work well, the crane stops 20min to 30min as trial load is lifted 10cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation.
4.How to make highway bridge concrete girders?
a.Full span prefabrication,
b.Segment girder prefabrication
c. Full span cast in place girder
d. Segment cast in situ
5.How about maintenance of900 ton erection girder railway launching girder manufacturer?
a. Lubricating.b. Steel wire rope.c. Spreader d. Pulley blocke.Wheels f. Brake
在线联系供应商
Other supplier products
| 40吨双梁龙门起重机,配有吊车 | 40吨双梁龙门起重机和起重机应用外部仓库或铁路侧共同提升和卸货工作,40吨双梁龙门起重机和起重机桥组成,支撑腿,起重机旅行器官,电车,电气设备,起重绞车,框架采用箱式焊接机理、大车运行机制是在司机室或远程控制,权力是由电缆滑线,有不同容量的双梁龙门起重机供您根据不同的用途选择。 电气及控制设备... | |
| 从中国供应商进口高质量的大型吊车吊钩 | 产品描述 从中国供应商进口的高质量的大型起重机吊钩通常配有安全锁扣,以防止吊索吊索、吊链或吊索脱离负载。中国供应商生产的优质大型起重回转钩,按外形可分为单钩和双钩,按生产方法可分为锻造钩和铸造钩。吊钩是连接起重机和起重机重量的纽带,起着至关重要的作用,必须重视对它的维护。质量上乘的大型吊车吊钩... | |
| 50t quay crane double girder container gantry crane for sale | Product Application 50t quay crane double girder container gantry cranealso called STS (ship to shore) crane, which isakindofhoistingmachine... | |
| Top quality steel truss type 180T cable stayed bridge launcher | Product Description Top quality steel truss type 180T cable stayed bridge launcher Top quality steel truss type 180T cable stayed bridge launcher... | |
| 工厂出口轮胎式带电动小车的隧道栈桥起重机 | 工厂出口轮胎式隧道栈桥采用柴油发动机交流发电机供电,工地内无需铺设轨道,可双向移动。大型无内胎轮胎的轴承。轮数是根据地面轮压的要求设计的。操作驾驶室的整个吊车。 |
Same products
| 1.22*1.22m Panel HDG Water Tank | 卖方: shijiazhuang Kaixuan Victor Technology Co.,Ltd | The1.22*1.22m Panel HDG Water Tank, also known as a Hot Dip Galvanized Water Tank or Pressed Stee... | |
| High Strength SMC Molded Water Tank | 卖方: shijiazhuang Kaixuan Victor Technology Co.,Ltd | The High Strength SMC Molded Water Tank, also widely known as a GRP Water Tank, FRP water tank, o... | |
| Glass Wool Board With Facing | 卖方: HEBEI LIANGPENG NEW MATERIAL CO.,LTD | Glass Wool Board With Facing What is Glass Wool Board With Facing? Glass Wool BoardWith Facing ... | |
| Brown Formaldehyde-Free Glass Wool Blanket | 卖方: HEBEI LIANGPENG NEW MATERIAL CO.,LTD | Brown Formaldehyde-Free Glass Wool Blanket Brown formaldehyde-free glass wool blanketis eco-frie... | |
| Glass Wool Blanket With Polypropylene Foil | 卖方: HEBEI LIANGPENG NEW MATERIAL CO.,LTD | Glass Wool Blanket With Polypropylene Foil What is Glass Wool Blanket With Polypropylene Facin... |