900 ton erection girder railway launching girder manufacturer for precast installation
Product Description
900 ton erection girder railway launching girder manufactureris generally used in the erection of the Highway Bridge and Subway Bridge, using the precast segmental prestress concrete box beam (PC beam) assembly. The main feature is the high efficiency of construction and self-traveling. Generally it is composed of the main beam, leg and winch trolley, the main girder is used for bearing, the leg is to execute machine transverse moving, longitudinal moving, leveling, support, cross span, cross scale and other functions, and the winch trolley used for lifting the precast girder.
Packing
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying;
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.
Delivery
1.If the size of 900 ton erection girder railway launching girder manufacturer are suitable for container ship, usually by container;
2.If the size is too big, usually by bulk ship or by container after truncation; Transport ways are based on reducing cost for you and keep the crane performance.
Delivery time
Within 30 to 40 working days after the receipt of deposit.
Transportation
Generally 35 days to 50 days to destination port.
FAQ
1.What’s the information should I provide when inquiry about the900 ton erection girder railway launching girder manufacturer?
a .we need the Bridge Drawing;the Maximum longitudinal slope and the Maximum Transverse slope;
b. The Girder/beam drawing;
2.How many Personnel and equipment to assemblelaunching gantryin the worksite we need?
Personnel: 8 to 10 workers equipment:
Truck crane>50t :2 sets
Φ19.5 steel wire rope 8m:4 ropes
Sleepers:several
Electric welding machine:1set
Oxygen, acetylene:1 set
Hammer(12pound and 8pound):1 set for each
Wrench and pincher:several
Gradienter:1set
3.What are inspection standard for load test of900 ton erection girder railway launching girder manufacturer?
a. Dynamic load test
1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overhead.
b. Static load test
1.25times rated load, all mechanisms work well, the crane stops 20min to 30min as trial load is lifted 10cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation.
4.How to make highway bridge concrete girders?
a.Full span prefabrication,
b.Segment girder prefabrication
c. Full span cast in place girder
d. Segment cast in situ
5.How about maintenance of900 ton erection girder railway launching girder manufacturer?
a. Lubricating.b. Steel wire rope.c. Spreader d. Pulley blocke.Wheels f. Brake
Send product request
Other supplier products
| 200 ton double truss beam launcher bridge erecting machine used high-speed railway bridge construction | Double truss beam launcher bridge erecting machine is suitable for the construction of bridge for roads, railways and other bridge erection constru... | |
| Single girder small mobile gantry crane 3 ton widely used workshop material handling price | Single girder small mobile gantry crane 3 ton widely used workshop material handling price is a kind of Medium-light crane, with CD, MD, HC type el... | |
| High Quality Overhead Crane Clamshell Grab for Sale | Product Description High Quality Overhead Crane Clamshell Grab is the bucket that can open and close to grasp the sediment and all kinds of bul... | |
| underslung segment launching gantry | Underslung Segmental Launching Gantry Precast Segmental Method with a segmental Launching Gantry (LG) is a very popular way used for the construct... | |
| 120 ton drawing customized double girder beam launcher bridge erecting machine | 120 ton drawing customized double girder beam launcher bridge erecting machine applied to the construction of the highway. The highway bridge erect... |
Same products
| 1.22*1.22m Panel HDG Water Tank | Seller: shijiazhuang Kaixuan Victor Technology Co.,Ltd | The 1.22*1.22m Panel HDG Water Tank, also known as a Hot Dip Galvanized Water Tank or Pressed S... | |
| High Strength SMC Molded Water Tank | Seller: shijiazhuang Kaixuan Victor Technology Co.,Ltd | The High Strength SMC Molded Water Tank, also widely known as a GRP Water Tank, FRP water tank,... | |
| Glass Wool Board With Facing | Seller: HEBEI LIANGPENG NEW MATERIAL CO.,LTD | Glass Wool Board With Facing What is Glass Wool Board With Facing? Glass Wool BoardWith Facing ... | |
| Brown Formaldehyde-Free Glass Wool Blanket | Seller: HEBEI LIANGPENG NEW MATERIAL CO.,LTD | Brown Formaldehyde-Free Glass Wool Blanket Brown formaldehyde-free glass wool blanketis eco-frie... | |
| Glass Wool Blanket With Polypropylene Foil | Seller: HEBEI LIANGPENG NEW MATERIAL CO.,LTD | Glass Wool Blanket With Polypropylene Foil What is Glass Wool Blanket With Polypropylene Facin... |