Hydraulic Liner Hanger Tie-Back Assembly
The tie-back assembly is a special cementing tool for tieback operation.
Tieback equipment allows existing liners with a receptacle to be extended to the surface or farther up hole, and provides a high-pressure seal at the top of a cemented or uncemented liner. TIW offers variety of tieback seal nipples and tieback packers to accommodate liner top extension and remedial operations. Today, some new types of drilling liner tieback equipment are developed due to the annular gas channeling in high-pressure oil-gas well even after tie back cementing.
Tie back liner procedureof Hydraulic Liner Hanger Tie-Back Assembly
Measure and drift the casings carefully and clean all the threads.
Calculate the kelly-up of the casing (the particular part of the last casing which is above the rotary table) and arrange the casing string.
Prepare several casings, which are approximately 0.5m shorter than the others and convenient for kelly-up calibration. (The actual kelly-up is not equal to the calculated value due to measurement error and the remaining threads of the casings.)
Connect the milling shoe and trip in. Polish the inner surface of the polished bore receptacle, make sure there is no debris.
Note the depth of the milling shoe when it reaches the top of the seal assembly (judge from the changes on pressure and WOB). Then lift the drill string for 1m.
Use a drilling rate of 40~50rpm and a normal flow rate. Slowly lower the drill string. Polish the inner surface of the polished bore receptacle twice or three times. Each time polish 3~4min. During the last polishing, apply an additional load of 2~3t when the torque suddenly increases (the milling shoe reaches the top of the seal assembly) during the last polishing. Polish for another 2~3min and note the depth of the milling shoe, which is an important clue for the casing setting depth.
Circulate with high flow rate for 5min.
Trip out and check the milling shoe. If there is a circle of polished trace and the diameter is equal to the I.D. of the left thread on the seal assembly, then the milling shoe have reached the bottom of the polished bore receptacle.
Features of Hydraulic Liner Hanger Tie-Back Assembly
With the guide shoe and circulate bore, it can stab into polished bore receptacle before cementing, more convenient than conventional cementing which pumps down cement before stabbing.
With its streamline shape, the guide shoe can stab into polished bore receptacle easily.
The Tieback Seal Assembly with three stacks of molyglass seal is designed for high-pressure and high-temperature liner tieback completions. Available in seal length is 1.2m.
As one of the top reliable liner hanger companies in China, Saigao has been devoted in the production of hydraulic liner hanger products. Drop us messages for any query to know more about Saigao and Saigao products.
Technical Parameters ofHydraulic Liner Hanger Tie-Back Assembly
|
Specifications, mm |
Φ177.8 |
Φ127.0 |
|
Sealing capacity, MPa |
25 |
25 |
|
Heat-proof Rating, ℃ |
120 |
120 |
|
Available Sealing Length, mm |
1200 |
1200 |
|
Φ155 |
Φ108 |
,
As one of the most professional oil well equipment manufacturers, Saigao Groupprovides oilfield cementing tools, tie back receptacle, tie back casing, liner hanger assembly, hydraulic hangercasing tie back, tie back liner and etc. Saigao products are not only popular in China, but also exported to Russia, Brazil, Australia, South Africa and other countries and regions.
Отправить запрос, связаться с поставщиком
Другие товары поставщика
| F500 Single-acting Mud Pump | F500 single-acting drilling rig mud pump equipment has two surfaces which can bear high strength to ensure high efficiency of the operation. We ri... | |
| Drill Pipe Single Plug Cement Head: Product No. ZSC-03 | Plug Dropping Indicator. Plug release Plunger Assembly. Pitching device. Bearing, rotating easy. Plug zsc valves threaded connection.... | |
| cementing-head | Cementing Head used in the oilfield is designed to hold a cementing plug before it is pumped down the casing during the cementing operation. In mos... | |
| Choke Manifold | Choke Manifold control and implementation of oil and gas pressure control technology. In case that the BOP is off, the pressure at the bottom of we... | |
| Drilling Tools | Drilling Tools for Sale In order to explore and exploit oil and natural gas deep in the strata, people must use a variety of drilling tools chin... |
Похожие товары
| Water Bulging Bottle Making Machine | Продавец: Yongkang Hubang Machinery Technology Co., Ltd. | Yongkang Hubang Machinery Technology Co., Ltd. specializes in machinery for thermos and bottle ma... | |
| TC SERIES 180-210 HP TRACTOR | Продавец: TIANJIN TRACTOR MANUFACTURING CO., LTD | Our company has long specialized in the development of high-horsepower wheeled tractors. This par... | |
| TVH2704-3504(Hybrid Tractor) | Продавец: TIANJIN TRACTOR MANUFACTURING CO., LTD | Hybrid tractorsadopt a diesel engine plus motor hybrid drive system. Supported by an intelligent ... | |
| 3Y SERIES 100-120 HP TRACTOR | Продавец: TIANJIN TRACTOR MANUFACTURING CO., LTD | With the advancement of agriculture, existing medium-sized tractorsare no longer sufficient to me... | |
| REAL CASE OF TS SERIES TRACTOR --TTS2404 | Продавец: TIANJIN TRACTOR MANUFACTURING CO., LTD | A 240 Horsepower Tractoris designed for large-scale agricultural operations that require strong p... |













