Modular HCL Tail Gas Scrubber
Modular HCLScrubber
|
Project Name |
45000m3/h HCL tail gas scrubber 25000m3/h HCL tail gas scrubber |
|
Location |
Daman, Saudi Arabia |
|
Time |
November, 2014 |
|
Client |
Steel wire rope manufacturer |
|
Scope of work |
EPC PCC provides EPC service, including process engineering design, pipe match, equipment design& manufacture, electrical appliance & meter installation, site installation guidance, commissioningand startup, training etc. |
|
Description |
The client provided the tail gas component and the local emission requirements. The discharge tailgas content is much lower than local emission standard This project was delivered within 45 days,finished installation and commissioning in 5 days. |
|
Evaluation |
The plant is running stably since started in November, 2014. The client is very satisfied, and developlong term cooperation with PCC. |
PCC prides itself as a leading Design, OEM (original equipment manufacturer) and Trading Company. We provide solvent recovery plant design, oil refinery engineering, etc. Want to know more? please contact us.
Send product request
Other supplier products
| LPG Plant | Application of LPG RecoveryPlant This lpg skid unitis applicable to wellhead associated gas pretreatment, including dehydration, hydrocarbon recov... | |
| Semi-regenerative Reforming | OVERVIEW Semi-regenerative Reforming (SRR): With the help of heating, hydrotreating and catalyst, petroleum reformingis a process which is used to... | |
| Solvent Recovery Plant | Solvent Recovery Plant Solvent Can Be Recovered Name of solvent Name of solvent Methanol Isopropanol Ethano... | |
| Modular Oil Refinery | Catalog of Modular Oil Refinery Mode Capacity (BPD) Power (Kw/d) Fabrication Period (month) Area (Acre) Skid Number Weight (Ton) ... | |
| Modular Oil Refinery | Catalog of Modular Oil Refinery Mode Capacity (BPD) Power (Kw/d) Fabrication Period (month) Area (Acre) Skid Number Weight (Ton) ... |