72.5kv High Voltage AIS & GIS Mobile transformer substation
The vehicle-mounted mobile substation consists of incoming HV switchgear system, main transformer, outgoing LV switchgear system and semitrailer etc. The cushion is provided between the equipment on vehicle and inside LV switchgear compartment and the trailer, so as to improve the transport reliability. Soft feeder is used for connection between equipment in order to avoid the damage of equipment resulting from deformation of compartment during travel. The period needed from arrangement to operation after the mobile substation reaches site is less than 180 minutes.
Other supplier products
|
LV Drawout Cabinet with rated operation voltage up to 660V and rated current upto 6300A |
The cabinet is applied for AC 50/60Hz distribution system with rated operation voltage up to 660V and rated current up to 6300A, as distribution, c... |
|
FZB Function-type wind power used prefabricated substation |
The substation is to manufacture and assemble the support equipments for wind-power step-up stations in advance, i.e. install step-up transformer, ... |
|
EPC contracting Design, manufacture, test, deliver, install, complete and commission certain Facilities contractor |
Shandong Taikai Power Engineering Co.,Ltd (hereinafter referred to as TKPE), located at the foot of mountain Tai, subordinated to Taikai Group, is ... |
|
Partial Discharge On-line Monitor System |
Based on the UHF detecting GIS partial discharge principle, the system is applied for real-time on-line intelligent monitor on GIS of each voltage ... |
|
72.5kv High Voltage AIS & GIS Mobile transformer substation |
The vehicle-mounted mobile substation consists of incoming HV switchgear system, main transformer, outgoing LV switchgear system and semitrailer et... |
All supplier products
Same products