.

3-Piece Metal Seat Ball Valve

Product Type: Ball ValveProduct Name: 3-Piece  Metal Seat Ball ValveProduct Details:Place of Origin: ChinaCertification: ISO9001-CEProduct RangeSize : Full Port: 1/4" - 4" (8mm - 100mm)               Standard Port: 3/4" - 2.5" (19mm - 65mm)Rating : 150~600LB(PN16~PN100)Body Materials : Carbon Steel, Stainless Steel, Alloy Steel, Duplex SteelTrim : Carbon Steel, Stainless Steel,End Connection : Threaded  ,Flanged Design by the standards of API6D, ASME, ANSI, JIS, DIN, BS, GB, etc.


Send product request

To: China Fagong Valve CO., Ltd
Your E-mail:
Message text:


Send to other suppliers

Other supplier products

2PC Floating Ball Valve
2PC Floating Ball Valve Design standard: ASME B16.34/ API 608Face to face: ASME B16.10Flanged end connection: ASME B16.5Butt welding end connection: ASME B16.25Wall thickn...
Cryogenic Globe Valve
Cryogenic Globe Valve DescriptionStainless steel #304L manual globe valve with extended bolted bonnet and butt welding ends in its standard version. The bubble-tight shu...
Cast Iron Flange Check Valve
Cast Iron Flange Check Valve Specifications1.MSS SP-71,BSEN 12334 design. 2Size:DN50-DN600. 3.WRAS rubber coated disc 4.FF:ISO/EN558/ANSI B16.10. 5.PN10/16 presure.TECHNICAL DA...
Soft Seal Lug Type Butterfly Valve
Soft Seal Lug Type Butterfly Valve Flange Drilling:options: DIN PN6/10/16ANSI CLASS 125/150JIS 10KBS10 TABLE "E"Optional Materials:Body: Cast Iron GG25, Ductile Iron GGG40, GGG50Disc...
Electro Butterfly Valve
Electro Butterfly Valve Product Type: Butterfly ValveProduct Name: Electro butterfly valvePlace of Origin: ChinaCertification: ISO9001-CEProduct DescriptionElectric Actuat...
All supplier products

Same products

The fastest delivery time for China Russia railway transportation is 10 days
The fastest delivery time for China Russia railway transportation is 10 days Seller: CHENGDU NEPTUNE SCM CO.,LTD. Xi'an--- Alashankou---Moscow
The fastest delivery time for China Russia railway transportation is 10 days
The fastest delivery time for China Russia railway transportation is 10 days Seller: CHENGDU NEPTUNE SCM CO.,LTD. Xi'an--- Alashankou---Moscow
The fastest delivery time for China Russia railway transportation is 10 days
The fastest delivery time for China Russia railway transportation is 10 days Seller: CHENGDU NEPTUNE SCM CO.,LTD. Xi'an--- Alashankou---Moscow
NITROGEN CABINET
NITROGEN CABINET Seller: Kunshan Gaoqiang Industrial Equipment Co.,Ltd Dryzone dry nitrogen box has a fast recovery time which is important for some industry demand, es...
Guitar Dry Cabinet
Guitar Dry Cabinet Seller: Kunshan Gaoqiang Industrial Equipment Co.,Ltd To give performers a better storage environment, Dryzone provides quality dry cabinets for instru...