Boxi and Gaoshaling Oil & Gas Treatment Plant Pipeline Recovery Project (Year 2018)

Project Introduction:

Abandoned 8”mixed transportation pipeline and 12” natural gas submarine/offshore pipeline of Boxi treatment plant, dismantled and recycled 600m section through the tunnel section of Gaoshaling port area, both ends on site sealing, pipeline ends sealing treatment;

About

Abandoned 8” mixed transportation pipeline and 12” natural gas submarine/offshore pipeline of Boxi treatment plant, dismantled and recycled 150m section through the breakwater, both ends on site sealing, pipeline ends sealing treatment.



Send product request

To: Tianjin Timeast Offshore Engineering Co., Ltd.
Your E-mail:
Message text:


Send to other suppliers

Other supplier products

Jidong Oil Field1-3 Island Submarine/Offshore Pipeline Post-Trenching Project (Year 2009)
Jidong Oil Field1-3 Island Submarine/Offshore Pipeline Post-Trenching Project (Year 2009) Jidong Oil Field1-3 Island Project (Year 2009) Project Introduction:16km submarine/offshore pipeline post-trenching.
Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/Subsea Production Platform A1,A2, Design, Fabrication and Site Installation
Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/Subsea Production Platform A1,A2, Design, Fabrication and Site Installation Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/A1,A2, Design, Fabrication and Site Installation Project Introduction:Jacket leg was ser...
CFD11-2 Offshore/Subsea Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO (Year 2007-2008)
CFD11-2 Offshore/Subsea Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO (Year 2007-2008) CFD11-2 Offshore/, Repair and Installation between SPM and FPSO (Year 2007-2008) Project Introduction: -Jumper Hose Parameter: ø 24”...
Liaobin Development Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2016)
Liaobin Development Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2016) Liaobin Development Area Submarine/(Year 2016) Project Introduction:The designed drainage quantity is 50,000 m3/d, subsea pipeline total length 9...
CNOOC LD Submarine/Offshore Pipeline Laying Project (Year 2004)
CNOOC LD Submarine/Offshore Pipeline Laying Project (Year 2004) Project Introduction:LD submarine/offshore pipeline laying project is part of CNOOC LD 5-2 oil field oil & gas development project. Wor...
All supplier products

Same products

The fastest delivery time for China Russia railway transportation is 10 days
The fastest delivery time for China Russia railway transportation is 10 days Seller: CHENGDU NEPTUNE SCM CO.,LTD. Xi'an--- Alashankou---Moscow
The fastest delivery time for China Russia railway transportation is 10 days
The fastest delivery time for China Russia railway transportation is 10 days Seller: CHENGDU NEPTUNE SCM CO.,LTD. Xi'an--- Alashankou---Moscow
The fastest delivery time for China Russia railway transportation is 10 days
The fastest delivery time for China Russia railway transportation is 10 days Seller: CHENGDU NEPTUNE SCM CO.,LTD. Xi'an--- Alashankou---Moscow
NITROGEN CABINET
NITROGEN CABINET Seller: Kunshan Gaoqiang Industrial Equipment Co.,Ltd Dryzone dry nitrogen box has a fast recovery time which is important for some industry demand, es...
Guitar Dry Cabinet
Guitar Dry Cabinet Seller: Kunshan Gaoqiang Industrial Equipment Co.,Ltd To give performers a better storage environment, Dryzone provides quality dry cabinets for instru...