Climbing Formwork
TECON automatic climbing formwork systemmainly includes Self-climbing Formwork TSC80, Jump Climbing Formwork CB180/240, Dam Formwork DB180/240 and Multi-function Climbing Formwork MB180, climbing cone formwork, edge formwork.
Automatic climbing formworkTSC80 can climb by itself via hydraulic cylinder, while Formwork CB180/240 can only climb via tower crane lift. Dam Formwork DB180/240 can fabricate both single side wall and double side wall without any tie rod pull through. Multi-function Climbing Formwork MB180 is always guided by its rail during climbing, and it can climb freely with or without tower crane lift sine it has its own mobile hydraulic cylinder.
They are widely used in high-rise buildings, bridge pylons, concrete tanks and other civil engineering project.
Send product request
Other supplier products
Girder | We have two types of formwork girderfor DIY or tailed formwork planning use. One is a conventional H20 timber beam, while another is an Aluminium I... | |
Dam Formwork DB180/240 | TECON Dam formwork DB180/240 is with high dependability and loading capacity for mass concrete structures without tie rod to pull through. It is wi... | |
Modular Formwork | TECON Modular Formworkmainly consists of AluLITE Formwork, Steel LITE Formwork and Plastic Formwork TP60+. For any villa project, a low-cost hou... | |
Shoring Tower TST60 | TECON Shoring TowerTST60 is the most cost-effective supporting frame system in formwork construction and is the quickest to assemble. It is special... | |
V-shore Frame | V-Shore Frame Conventional Scaffoldingis a high load conventional shoring system consisting of three major components: frames, cross braces, top &a... |