Balanced cantilever 180 ton overhead bridge form traveler

Balanced cantilever 180 ton overhead bridge form traveler
Form Traveler is used Balance Cantilever Construction Method. Balanced cantilever 180 ton overhead bridge form traveler is easier to be use compare to Under Slung Model. And it is easier to be modified for future usage.Our Balanced cantilever 180 ton overhead bridge form traveler are with good quality modular connection, designed for future modification and repeated usage for many years. We supply good quality metal formwork. We also provide plywood formwork system as it is a more economical solution.
Concreting Support, self-launching operation, level adjustments are all by means of hydraulic system. Erection of the Balanced cantilever 180 ton overhead bridge form traveler on the pier top can be as short as 1 week. All major parts join together by pin connection, which promises speedy erection and high accuracy design.
Our company
Huada Heavy Industry is a big enterprise specialized in researching, developing, producing and exporting.
It mainly produces overhead crane and gantry crane, beam launcher, movable scaffolding system crane, Balanced cantilever 180 ton overhead bridge form traveler, straddle carrier, tyre transportor, beam trolley, portal crane and electric winch, electric hoist and all kinds of accessories, which widly cover machinery, metallurgy, electric power, railway, water conservancy, ports, terminals and other industries.
Huada Heavy Industry have more than 600 staff, and covers 200,000 square meters.
Our advantages:
A. More than 50 R&D personnel with advanced Science and technology.
B. More than 400 sets advanced Production processing equipment and inspection equipment.
C. Independent intellectual property rights to develop energy saving bridge cranes, gantry cranes, and electric hoist.
D. Obtain ISO 9001 certificate and more than 10 series of patent certificates.
E. Efficient service and competitive products.
F. Export more than 100 countries.
Packing
1. Hydraulicparts are packed by high quality plywood crate to reduce distortion.
2. Structure are packed by plastic woven cloth to reduce abrasion during transporting.
Delivery
1. If the size of Balanced cantilever 180 ton overhead bridge form traveler are suitable for container ship, usually by container.
2. If the size is too big, usually by bulk ship or by container after disassembly.
3. Transport ways are based on reducing cost and keep the Balanced cantilever 180 ton overhead bridge form travelerperformance.
Deliverytime
Could be deliveried within 30 to 40 days after the receipt of deposit.
Transportation
Generally35daysto50daystodestinationport.Shenghua Balanced cantilever 180 ton overhead bridge form traveler is designed for safety.
Emergency stop button, Limit switch, sensor are located at designated location. Lighting and spare-parts are part of the items coming with Balanced cantilever 180 ton overhead bridge form traveler.
1. 12 months warranty after installation and commissioning in addition to the human damage factors.
2. 1 year spare-parts provided for better maintenance.
3. Professional technical staffs provide installation, commissioning and training services. The installation team can be sent to local site to install for customer.
4. Delivery with English user manual, parts manual, product certification and other relevant certificates.
5. Technical advisory for any time.
6. Test before shipment
Send product request
Other supplier products
| 120 ton drawing customized double girder beam launcher bridge erecting machine | 120 ton drawing customized double girder beam launcher bridge erecting machine applied to the construction of the highway. The highway bridge erect... | |
| beam launcher bridge building equipment | Beam LauncherMain Features ◆ The beam Launcher has many advantages, such as light weight, high stiffness, low deflection, and high wind-resistance... | |
| Segmental assembly concrete 1500T launching gantry machine for highway project | Product Description Segmental assembly concrete 1500T launching gantry machine The Segmental assembly concrete 1500T launching gantry machine is us... | |
| high quality 1000T concrete segmental launching gantry crane with hydraulic system | The1000T concrete segmental launching gantry craneis used to construct prefabricated spans up to 60m long. It is designed and fabricated in order t... | |
| 80 tons easy operation ship building dock gantry crane | Product Description 80 tons easy operation ship building dock gantry craneis applied outside warehouse or railway sideways to do common lifting an... |
Same products
| Double girder overhead crane for warehouse loading goods | Seller: Hefei Chunhua Hoisting Machinery Co., Ltd. | Company Vision Striving to become a first-class modern industrial equipment manufacturing enterp... | |
| Column type folding arm crane | Seller: HEBEI KUNDA HOISTING EQUIPMENT CO., LTD | BASIC INTRODUCTION Product Name: TOYO Column type folding arm crane Key Component: Equipped wit... | |
| Excavator Crane Jib | Seller: Longhe Intelligent Equipment Manufacturing Co., Ltd | Excavator Crane Jib Product Description The is designed with a focus on safety and reliability.... | |
| 708-8F-31174 Final Drive Reducer For Komatsu PC200-8 | Seller: A&S Construction Machinery Co., Ltd. | A&S Construction Machinery Co., Ltd. supplies all types of reducers. All the brands of reduc... | |
| Customized Single Beam / Double Beam Bridge Crane | Seller: KunFeng Heavy Industry (Suzhou) co., LTD. (KF CRANE) | TYPE Single Beam / Double Beam Overhead Crane Tonnage 1T | 2T | 3T | 5... |