.

Spent Acid Waste Recovery Boiler

Spent Acid Waste Heat BoilerNecessitySulfuric acid is one of the most important raw material for many industries,Website:, and a nation's sulfuric acid production indicates its industrial strength. One of the most ecological conscious production methods is to produce acid from spent acid (spent sulfuric acid or other sulfur containing compounds). Typically, spent acid is sprayed into a direct fired combustion chamber at the temperature of 1000 Deg Celsius, after which the acid is vaporized and decomposed into SO2, H2O and O2. The SO2 containing gas then flows through a waste heat recovery boiler to be cooled down to approximately 400 Deg Celsius for the next ongoing gas purification process. Design IngenuityThe flue gas flowing out of the thermal decomposition furnace is highly corrosive and with molten dust particles. Our waste heat boiler for this application adopts fire-tube structure, in which each gas tube is equipped with a direct door for easy cleaning. By virtue of our design integrity, tube wall temperature always stays higher than the dew point of gaseous sulfuric acid, hence the entire heat exchange surface area is not susceptible to corrosion. The average investment recovery period is approximately 3.5 years. Key ParametersRated steam pressure: 3.8 MPA ~ 6.4 MPA Rated steam temp: saturated steam tempPROJECT SPENT ACID REGENERATION WASTE HEAT RECOVERY FOR: DONGYING CITY KEDE CHEMICAL CO., LTD. Rated steam output: 4 T / H @ 3.8 MPARated steam temp: 248.9 Deg Celsius (saturated temp)


Send product request

To: JSDJ HEAVY INDUSTRY CO., LTD.
Your E-mail:
Message text:


Send to other suppliers

Other supplier products

Waste Heat Recovery Boiler For Billet Reheating Furnace
Waste Heat Recovery Boiler For Billet Reheating Furnace Waste Heat Recovery Boiler for Billet Reheating FurnaceNecessityThe steel rolling process consumes a tremendous amount energy,Website:, for which t...
Boiler Drum
Boiler Drum boiler drumBoiler drum is processed by laser CNC gas-cutting technology. Preliminary material preparation is conducted as per required drawings dim...
Boiler Membrane Wall
Boiler Membrane Wall 18.Boiler Membrane Wall Boiler membrane wall sections are processed with automatic submerged arc welding technology and pipe panels are adjusted by...
Hazardous Waste Incineration Heat Recovery Boiler
Hazardous Waste Incineration Heat Recovery Boiler Hazardous Waste Incineration Waste Heat Recovery Boiler NecessityIt is estimated that the overall global production of hazardous waste is 330,Websi...
Non-ferrous Smelting Waste Heat Recovery
Non-ferrous Smelting Waste Heat Recovery Non-ferrous Metal SmeltingWaste Heat BoilerNecessityThe metallurgical process of non-ferrous metal consumes a lot of energy which accounts for 10% ...
All supplier products

Same products

2BV6161 Liquid Ring Vacuum Pump
2BV6161 Liquid Ring Vacuum Pump Seller: Greentech International (Zhangqiu) Co., Ltd 2BV6161 Liquid Ring Vacuum Pump2BV series liquidring vacuum pumps are suitable for pumping the ga...
2BV6131 Liquid Ring Vacuum Pump
2BV6131 Liquid Ring Vacuum Pump Seller: Greentech International (Zhangqiu) Co., Ltd 2BV6131 Liquid Ring Vacuum Pump2BV series liquidring vacuum pumps are suitable for pumping the ga...
2BV6121 Liquid Ring Vacuum Pump
2BV6121 Liquid Ring Vacuum Pump Seller: Greentech International (Zhangqiu) Co., Ltd 2BV6121 Liquid Ring Vacuum Pump2BV series liquidring vacuum pumps are suitable for pumping the ga...
2BV6111 Liquid Ring Vacuum Pump
2BV6111 Liquid Ring Vacuum Pump Seller: Greentech International (Zhangqiu) Co., Ltd 2BV6111 Liquid Ring Vacuum Pump2BV series liquidring vacuum pumps are suitable for pumping the ga...
2BV5161 Water Ring Vacuum Pump
2BV5161 Water Ring Vacuum Pump Seller: Greentech International (Zhangqiu) Co., Ltd 2BV5161 water ring vacuum pump2BV series liquidring vacuum pumps are suitable for pumping the gas...