7.5 MW Solar Taurus T70 Cogeneration Turbine Power Plant
7520 KW Solar Taurus 70 Gas Turbine, Leroy Somer Generator, Fuel: Gas, 50 HZ, Year 2000, Hours since overhaul 18,100 hrs. Complete Plant that includes HRSG, Economizer, Bypass with Stack, Cooling Towers, Gas Metering Station, Gas Booster Compressor, PCC Panel, MCC Panel, SCADA DCS Panel, Power Plant is still under a service maintenance contract and has been since new.
Other supplier products
|
16 MW Stal Laval Back Pressure Steam Turbine |
16 MW Stal Laval Back Pressure Steam Turbine
Working pressure: 36 bar, max pressure: 42 bar Extraction: 11,8 bara,
backpressure: 4,7 bara. Steamflo... |
|
1765 KW Stal Laval Back Pressure Steam Turbine |
1765 KW Stal Laval Back Pressure Steam Turbine
This is an older turbine that has been very well maintained, Only 200 hrs since overhaul.
Year 1937,... |
|
10.7 MW Jenbacher JMS 616 Natural Gas Power Plant |
Four (4) 2677 KW JMS 616 Gas engines, AVK alternators, 50 HZ, 11000 volt, Year: 2010,
Fuel: Natural Gas, starting system, controls panels, master c... |
|
72 MW Westinghouse 251 B11 Gas Turbine Power Plant |
72 MW Westinghouse 251 B11 Gas Turbine Power Plant
47 MW Westinghouse W251-B11 Gas Turbine with a brush electric generator, 3000 rpm,
50 HZ, 11.5 K... |
|
1064 KW Jenbacher JG320 Gas Generator Set |
1064 KW Jenbacher JG320 Gas Generator Set
415 Volt, 1500 rpm, 50 HZ, Year: 2006, Fuel: Natural Gas, 36,081 hrs, includes circuit breaker, radiator,... |
All supplier products
Same products