7.5 MW Solar Taurus T70 Cogeneration Turbine Power Plant
7520 KW Solar Taurus 70 Gas Turbine, Leroy Somer Generator, Fuel: Gas, 50 HZ, Year 2000, Hours since overhaul 18,100 hrs. Complete Plant that includes HRSG, Economizer, Bypass with Stack, Cooling Towers, Gas Metering Station, Gas Booster Compressor, PCC Panel, MCC Panel, SCADA DCS Panel, Power Plant is still under a service maintenance contract and has been since new.
Other supplier products
|
Three (3) 2000 KVA Caterpillar G3516C Gas Generator Sets (Complete 6000 KVA Plant) |
Three (3) 2000 KVA Caterpillar G3516C Gas Generator Sets (Complete 6000 KVA Plant)
2000 KVA/1.6 MW continuous, G3516C Natural Gas Generator Sets, I... |
|
1364 KW Duetz TCG 2020V16 Gas Generator Set |
1364 KW Duetz TCG 2020V16 Gas Generator Set
1364 KW, 50 HZ, 400 volt, Year 2006, 42,000 hrs with the E60 maintenance completed,
cooling tower, circ... |
|
72 MW Westinghouse 251 B11 Gas Turbine Power Plant |
72 MW Westinghouse 251 B11 Gas Turbine Power Plant
47 MW Westinghouse W251-B11 Gas Turbine with a brush electric generator, 3000 rpm,
50 HZ, 11.5 K... |
|
6.1 MW Jenbacher J612 Natural Gas Generator Plant |
Three (3) 2058 KW Jenbacher J612 gas engines, AVK alternators, 1500 rpm, 11,000 volt, 50 HZ, Year 2011, Only 1500 hours on sets. Fuel: Natural Gas,... |
|
16 MW Stal Laval Back Pressure Steam Turbine |
16 MW Stal Laval Back Pressure Steam Turbine
Working pressure: 36 bar, max pressure: 42 bar Extraction: 11,8 bara,
backpressure: 4,7 bara. Steamflo... |
All supplier products
Same products