Supermarket Shelves Roll Forming Machine
The profile drawing for supermarket shelves roll forming machineThe thickness of Material: 1.5-2.5mm Working flow of supermarket shelves roll forming machine: uncoiler—Leveling—Punching--roll forming--- hydraulic cut to length—output table Main Specification of supermarket shelves roll forming machine
1) Main roll forming system
Main motor power: 18.5kw
Drive: Double Chain 1.2"
Main shaft dia: ¢76mm material: 45﹟forge steel and quenched
Roller material: Gcr5 bearing steel and quench treatment 58-62,Website:, chrome coated 0.05mm
Roll station:18 groups
Raw material: 1.5mm
Working speed: 0m--15m/min(include Punching time)
Coder: Omron
PLC: YASKAWA, made in Japan. 380V 50HZ
Computer operating panel: touching screen 5) Motor punching and hydraulic cutting
Hydraulic power: 5.5KW
Material of punching mould and cutting blade: Cr12,quenched 58°-62°
Working pressure:20mpa
Punching motor: 5.5KW
Punching frequency: 50/min
Power of Servo motor: 2.2KWEquipment list for supermarket shelves roll forming machine: NO.ProductQuant.15T Manual uncoiler12Separate Motor punching machine13Main Roll forming(cutting, PLC computer, Hydraulic system)14Output table(Freely)2Detailed information of supermarket shelves roll forming machine Terms of payment: 30%T/T ,Balance to be paid before shipping after inspection Deliver time: 60days after get 30% down payment Warranty: 1 year warranty from date of shipment Guarantee: Photos for supermarket shelves roll forming machine: Company CertificatesExhibition After sales service:
1).Engineer will give free training lessons to labors in buyer’s factory.
2).The Buyer will buy the round-trip air ticket for Engineer if visa application is approved.
3).The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 for engineer per day.
4).During this guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, we will provide the buyer spare parts at cost price.
5).We will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
Other supplier products
All supplier products
Same products