2 ton jib crane
2 ton jib crane is operated by the flashlight button. The flashlight has 2-6 buttons. Usually the 6-point switch controls the level of fast rise, fast fall, slow rise, slow drop, left and right turn and hoist trolley. Usually, 2 ton jib crane can be equipped with Angma manual trolley within 500kg. The push button switch can only operate up and down. More than 1t can be equipped with Angma electric trolley. It can have up and down, left and right, front and rear operation switches.
note:
1. Do not press the speed button and the reverse button of the same motor at the same time.
2. When working, it is forbidden to stand under the boom.
3. It is forbidden to pull and pull heavy objects.
4. It is forbidden to lift excessively.
Other supplier products
|
|
Single Girder Suspend Crane, 3T/5T for Workshop Lifting |
Welcome to consult single girder suspend crane, 3t/5t for workshop lifting price and quotation with Henan Dowell Crane Co.,Ltd, which is one of the... |
|
|
Slewing Jib Crane 7.5t with Ce Certificated |
Welcome to consult slewing jib crane 7.5t with ce certificated price and quotation with Henan Dowell Crane Co.,Ltd, which is one of the leading sle... |
|
|
Overhead Garage Crane |
Welcome to consult overhead garage crane price and quotation with Henan Dowell Crane Co.,Ltd, which is one of the leading overhead garage crane man... |
|
|
Fast-Construct Steel Structure for Warehouse |
Welcome to consult fast-construct steel structure for warehouse price and quotation with Henan Dowell Crane Co.,Ltd, which is one of the leading fa... |
|
|
Double Beam 30Ton Overhead Crane |
China Supplier.Quality assurance.Exported 100+ countries.2 Years quality warranty. Factory since 1955.Overseas Engineer guide installation |
All supplier products
Same products