120 ton 150 ton bridge erecting building construction

Product Description

120 ton 150 ton bridge erecting building construction is used in the erection of precast beam bridges for span by span method of construction for precast beam girders like T beam, U beam, etc. This self-beam launcher is suitable for bridge construction over river, valley or highway and so on. 
120 ton 150 ton bridge erecting building construction is suitable for the construction of bridge for roads, railways and other bridge erection construction site. Its main function is to lift the prefabricated beams, then transported onto the prefabricated pier. 120 ton 150 ton bridge erecting building construction has big difference from the general cranes. It requests high security.

Our advantages:
A. More than 50 R&D personnels with advanced Science and technology
B. More than 400 sets advanced Production processing equipment and inspection equipment
C. Independent intellectual property rights to develop energy saving bridge cranes, gantry cranes, and electric hoist
E. Obtain ISO 9001 certificate and more than 10 series of patent certificates
F. Efficient service and competitive products
G. Export more than 100 countries

Packing 
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying; 
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.

 

Delivery 
1.If the size of 120 ton 150 ton bridge erecting building construction are suitable for container ship, usually by container;
2.If the size is too big, usually by bulk ship or by container after truncation; Transport ways are based on reducing cost for you and keep the crane performance.

 

Delivery time 
Within 30 to 40 working days after the receipt of deposit.

 

Transportation 
Generally 35 days to 50 days to destination port. 

FAQ

1.What’s the information should I provide when inquiry about the beam launcher? 
1.1 We need the Bridge Drawing;the Maximum longitudinal slope and the Maximum Transverse slope; 
1.2 The Girder/beam drawing;                                            
2.What are inspection standard for load test of 120 ton 150 ton bridge erecting building construction?
2.1. Dynamic load test
1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overheat. 
2.2. Static load test 
1.25times rated load, all mechanisms work well, the crane stops 20-30min as trial load is lifted 10cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation; 
3.How to make highway bridge concrete girders? 
a. Full span prefabrication, 
b. Segment girder prefabrication 
c. Full span cast-in-place girder 
d. Segment cast-in-situ 




Send product request

To: Huada Heavy Industry
Your E-mail:
Message text:


Send to other suppliers

Other supplier products

Top quality steel truss type 180T cable stayed bridge launcher
Top quality steel truss type 180T cable stayed bridge launcher Product Description Top quality steel truss type 180T cable stayed bridge launcher Top quality steel truss type 180T cable stayed bridge launcher...
80 tons easy operation ship building dock gantry crane Product Description 80 tons easy operation ship building dock gantry crane is applied outside warehouse or railway sideways to do common lift...
hot quality 300T bridge erection beam launcher equipment The unique 300T bridge erection beam launcher equipment is designed for highspeed way,railway,LRT project. According to the situation of ...
Specialized 200ton double truss T beam beam launcher crane for railway bridge erection Product Description 200ton double truss T beam beam launcher crane for railway bridge erection is used in the erection of precast beam bridges for...
200ton double truss t beam beam launcher crane 200ton double truss t beam beam launcher crane is used in the erection of precast beam bridges for span by span method of construction for pre...
All supplier products

Same products

120ton MRT bridge u beam girder erection beam launcher machine
120ton MRT bridge u beam girder erection beam launcher machine Seller: Huada Heavy Industry Product Description 120ton MRT bridge u beam girder erection beam launcher machine is used in th...
Ce Approved Beam Launcher For Beam
Ce Approved Beam Launcher For Beam Seller: Huada Heavy Industry Product Description Ce Approved Beam Launcher For Beam Ce Approved Beam Launcher For Beam is su...
prefab china economic living container house
prefab china economic living container house Seller: Qingdao Aolifeng building materials manufacture Co.,Ltd. Expandable luxury pack Australian Standard container house The expandable container house was bee...
Light Weight Steel Aircraft Hangar Prefabricated Design
Light Weight Steel Aircraft Hangar Prefabricated Design Seller: Qingdao Aolifeng building materials manufacture Co.,Ltd. Steel material: Q345B=S355JR,SM490,ASTM A572; Q235B=S235JR,SS400,ASTM A36 Carbon structural steel...
Low Cost Industrial Metal Aircraft Hangar Shed Designs
Low Cost Industrial Metal Aircraft Hangar Shed Designs Seller: Qingdao Aolifeng building materials manufacture Co.,Ltd. Steel material: Q345B=S355JR,SM490,ASTM A572; Q235B=S235JR,SS400,ASTM A36 Carbon structural steel...