120 ton 150 ton bridge erecting building construction

Product Description

120 ton 150 ton bridge erecting building construction is used in the erection of precast beam bridges for span by span method of construction for precast beam girders like T beam, U beam, etc. This self-beam launcher is suitable for bridge construction over river, valley or highway and so on. 
120 ton 150 ton bridge erecting building construction is suitable for the construction of bridge for roads, railways and other bridge erection construction site. Its main function is to lift the prefabricated beams, then transported onto the prefabricated pier. 120 ton 150 ton bridge erecting building construction has big difference from the general cranes. It requests high security.

Our advantages:
A. More than 50 R&D personnels with advanced Science and technology
B. More than 400 sets advanced Production processing equipment and inspection equipment
C. Independent intellectual property rights to develop energy saving bridge cranes, gantry cranes, and electric hoist
E. Obtain ISO 9001 certificate and more than 10 series of patent certificates
F. Efficient service and competitive products
G. Export more than 100 countries

Packing 
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying; 
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.

 

Delivery 
1.If the size of 120 ton 150 ton bridge erecting building construction are suitable for container ship, usually by container;
2.If the size is too big, usually by bulk ship or by container after truncation; Transport ways are based on reducing cost for you and keep the crane performance.

 

Delivery time 
Within 30 to 40 working days after the receipt of deposit.

 

Transportation 
Generally 35 days to 50 days to destination port. 

FAQ

1.What’s the information should I provide when inquiry about the beam launcher? 
1.1 We need the Bridge Drawing;the Maximum longitudinal slope and the Maximum Transverse slope; 
1.2 The Girder/beam drawing;                                            
2.What are inspection standard for load test of 120 ton 150 ton bridge erecting building construction?
2.1. Dynamic load test
1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overheat. 
2.2. Static load test 
1.25times rated load, all mechanisms work well, the crane stops 20-30min as trial load is lifted 10cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation; 
3.How to make highway bridge concrete girders? 
a. Full span prefabrication, 
b. Segment girder prefabrication 
c. Full span cast-in-place girder 
d. Segment cast-in-situ 




Send product request

To: Huada Heavy Industry
Your E-mail:
Message text:


Send to other suppliers

Other supplier products

underslung segment launching gantry Underslung Segmental Launching Gantry Precast Segmental Method with a segmental Launching Gantry (LG) is a very popular way used for the construct...
300 ton bridge erecting cranes beam launcher machine for subway bridge construction
300 ton bridge erecting cranes beam launcher machine for subway bridge construction Product Description 300 ton bridge erecting cranes beam launcher machine 300 ton bridge erecting cranes beam launcher machine is used in the...
200 ton double truss beam launcher bridge erecting machine used high-speed railway bridge construction Double truss beam launcher bridge erecting machine is suitable for the construction of bridge for roads, railways and other bridge erection constru...
hot quality 300T bridge erection beam launcher equipment The unique 300T bridge erection beam launcher equipment is designed for highspeed way,railway,LRT project. According to the situation of ...
120ton double truss beam launcher crane for railway construction
120ton double truss beam launcher crane for railway construction Product Description The unique 120ton double truss beam launcher crane for railway construction is designed for highway and rail...
All supplier products

Same products

Factory price 450 ton highway railway mobile rubber tyred gantry cranes
Factory price 450 ton highway railway mobile rubber tyred gantry cranes Seller: Huada Heavy Industry Product Description Factory price 450 ton highway railway mobile rubber tyred gantry cranes with...
Hot Sale Double Beam Rubber Tyred Mobile Gantry Cranes
Hot Sale Double Beam Rubber Tyred Mobile Gantry Cranes Seller: Huada Heavy Industry Product Description Hot Sale Double Beam Rubber Tyred Mobile Gantry Cranes with diesel e...
Ductile Iron Pipe(Self-anchored or Restrained Joint)
Ductile Iron Pipe(Self-anchored or Restrained Joint) Seller: Ductile Iron Pipe(Tyton Joint or Push on Joint),Ductile Iron Pipe(K Type Joint or Mechanical Joint), Ductile Iron Pipe(Self-anchored or Restrained Joint) Specifications: 1)  The standard of pipe: ISO 2531 - 1998, EN545-2002 , K9 2) &nbs...
Ductile Iron Pipe(K Type Joint or Mechanical Joint)
Ductile Iron Pipe(K Type Joint or Mechanical Joint) Seller: Ductile Iron Pipe(Tyton Joint or Push on Joint),Ductile Iron Pipe(K Type Joint or Mechanical Joint), Ductile Iron Pipe(Self-anchored or Restrained Joint) Quick Details Place of Origin: Shanxi, China (Mainland) Brand Name: SOLID Model Number: T/K...
Ductile Iron Pipe(Tyton Joint or Push on Joint)
Ductile Iron Pipe(Tyton Joint or Push on Joint) Seller: Ductile Iron Pipe(Tyton Joint or Push on Joint),Ductile Iron Pipe(K Type Joint or Mechanical Joint), Ductile Iron Pipe(Self-anchored or Restrained Joint) Place of Origin: Shanxi, China (Mainland) Brand Name: SOLID Model Number: T/K Length: 5.7m...