120 ton 150 ton bridge erecting building construction

Product Description

120 ton 150 ton bridge erecting building construction is used in the erection of precast beam bridges for span by span method of construction for precast beam girders like T beam, U beam, etc. This self-beam launcher is suitable for bridge construction over river, valley or highway and so on. 
120 ton 150 ton bridge erecting building construction is suitable for the construction of bridge for roads, railways and other bridge erection construction site. Its main function is to lift the prefabricated beams, then transported onto the prefabricated pier. 120 ton 150 ton bridge erecting building construction has big difference from the general cranes. It requests high security.

Our advantages:
A. More than 50 R&D personnels with advanced Science and technology
B. More than 400 sets advanced Production processing equipment and inspection equipment
C. Independent intellectual property rights to develop energy saving bridge cranes, gantry cranes, and electric hoist
E. Obtain ISO 9001 certificate and more than 10 series of patent certificates
F. Efficient service and competitive products
G. Export more than 100 countries

Packing 
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying; 
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.

 

Delivery 
1.If the size of 120 ton 150 ton bridge erecting building construction are suitable for container ship, usually by container;
2.If the size is too big, usually by bulk ship or by container after truncation; Transport ways are based on reducing cost for you and keep the crane performance.

 

Delivery time 
Within 30 to 40 working days after the receipt of deposit.

 

Transportation 
Generally 35 days to 50 days to destination port. 

FAQ

1.What’s the information should I provide when inquiry about the beam launcher? 
1.1 We need the Bridge Drawing;the Maximum longitudinal slope and the Maximum Transverse slope; 
1.2 The Girder/beam drawing;                                            
2.What are inspection standard for load test of 120 ton 150 ton bridge erecting building construction?
2.1. Dynamic load test
1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overheat. 
2.2. Static load test 
1.25times rated load, all mechanisms work well, the crane stops 20-30min as trial load is lifted 10cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation; 
3.How to make highway bridge concrete girders? 
a. Full span prefabrication, 
b. Segment girder prefabrication 
c. Full span cast-in-place girder 
d. Segment cast-in-situ 



在线询价

至: Huada Heavy Industry
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

Top quality steel truss type 180T cable stayed bridge launcher
Top quality steel truss type 180T cable stayed bridge launcher Product Description Top quality steel truss type 180T cable stayed bridge launcher Top quality steel truss type 180T cable stayed bridge launcher...
hot quality 300T bridge erection beam launcher equipment The unique 300T bridge erection beam launcher equipment is designed for highspeed way,railway,LRT project. According to the situation of ...
100 ton to 300 ton bridge erection crane beam launcher for highway or railway 100 ton to 300 ton bridge erection crane beam launcher for highway or railway is to lift the prefabricated beam slice and put it on the prefabricat...
underslung segment launching gantry Underslung Segmental Launching Gantry Precast Segmental Method with a segmental Launching Gantry (LG) is a very popular way used for the construct...
Heavy duty easy maintenance 100ton to 800ton boat lifting gantry crane
Heavy duty easy maintenance 100ton to 800ton boat lifting gantry crane Heavy duty easy maintenance 100ton to 800ton boat lifting gantry craneHeavy duty easy maintenance 100ton to 800ton boat lifting gantry crane is app...
供应产品

Same products

golden brand top running and best price sale motor-driven beam traveling europe style single girder overhead crane
golden brand top running and best price sale motor-driven beam traveling europe style single girder overhead crane 卖方: Nucleon (Xinxiang) Crane Product Description golden brand top running and best price sale motor-driven beam traveling eur...
160t qd type rails mobile overhead bridge crane for sale
160t qd type rails mobile overhead bridge crane for sale 卖方: Nucleon (Xinxiang) Crane Product Description Overhead cranes sometimes also called bridge cranes and eot cranes, which ar...
伊索雷特 暖边间隔条 卖方: 大连华工创新科技股份有限公司 伊索雷特品牌暖边条主要有两种,一种是由不锈钢制成的产品,另一种是由不锈钢和塑料复合制成的产品。 隔热节能 低导热的不锈钢,或非金属隔热材料与厚度约只有0.1mm的不锈钢材板完美复合,使得导热...
Factory hot sale mobile yacht 150t boat lifting hoist crane
Factory hot sale mobile yacht 150t boat lifting hoist crane 卖方: Huada Heavy Industry Product Application The factory hot sale mobile yacht 150t boat lifting hoist crane includ...
Customized factory used double beam 20 ton overhead crane
Customized factory used double beam 20 ton overhead crane 卖方: Nucleon (Xinxiang) Crane factory used double beam 20 ton overhead crane sometimes also called bridge cranes and eot c...