.

900 ton erection girder railway launching girder manufacturer for precast installation

Product Description

900 ton erection girder railway launching girder manufactureris generally used in the erection of the Highway Bridge and Subway Bridge, using the precast segmental prestress concrete box beam (PC beam) assembly. The main feature is the high efficiency of construction and self-traveling. Generally it is composed of the main beam, leg and winch trolley, the main girder is used for bearing, the leg is to execute machine transverse moving, longitudinal moving, leveling, support, cross span, cross scale and other functions, and the winch trolley used for lifting the precast girder.

Packing

1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying;

2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.

Delivery

1.If the size of 900 ton erection girder railway launching girder manufacturer are suitable for container ship, usually by container;
2.If the size is too big, usually by bulk ship or by container after truncation; Transport ways are based on reducing cost for you and keep the crane performance.

Delivery time

Within 30 to 40 working days after the receipt of deposit.

Transportation

Generally 35 days to 50 days to destination port.

FAQ

1.What’s the information should I provide when inquiry about the900 ton erection girder railway launching girder manufacturer?
a .we need the Bridge Drawing;the Maximum longitudinal slope and the Maximum Transverse slope;
b. The Girder/beam drawing;

2.How many Personnel and equipment to assemblelaunching gantryin the worksite we need?
Personnel: 8 to 10 workers equipment:
Truck crane>50t :2 sets
Φ19.5 steel wire rope 8m:4 ropes
Sleepers:several
Electric welding machine:1set
Oxygen, acetylene:1 set
Hammer(12pound and 8pound):1 set for each
Wrench and pincher:several

Gradienter:1set
3.What are inspection standard for load test of900 ton erection girder railway launching girder manufacturer?
a. Dynamic load test
1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overhead.
b. Static load test
1.25times rated load, all mechanisms work well, the crane stops 20min to 30min as trial load is lifted 10cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation.
4.How to make highway bridge concrete girders?
a.Full span prefabrication,
b.Segment girder prefabrication
c. Full span cast in place girder
d. Segment cast in situ
5.How about maintenance of900 ton erection girder railway launching girder manufacturer?
a. Lubricating.b. Steel wire rope.c. Spreader d. Pulley blocke.Wheels f. Brake


Send product request

To: Huada Heavy Industry
Your E-mail:
Message text:


Send to other suppliers

Other supplier products

Crane Spare Parts - Electric Winch Steel Wire Rope Drum Reel
Crane Spare Parts - Electric Winch Steel Wire Rope Drum Reel Product Description Crane Spare Parts - Electric Winch Steel Wire Rope Drum Reel has mainly two type: Casting iron Drum Reel, Steel plate Drum ...
High quality best double beam 100 ton box type shipyard portal gantry crane with electric winch price
High quality best double beam 100 ton box type shipyard portal gantry crane with electric winch price Product Description Double beam 100 ton box type shipyard portal gantry crane with electric winch price is a gantry crane of large lifting capa...
Reasonable price 10 ton electrical design semi gantry crane
Reasonable price 10 ton electrical design semi gantry crane Product Description 10 Ton Electrical Design Semi Gantry Craneis a kind of light type crane, commonly used in modern production. In workshops where...
800 ton underslung movable scaffolding system
800 ton underslung movable scaffolding system 800 ton underslung movable scaffolding system is a fully self-supporting formwork system that builds the bridges with span-by-span cast-in-situ met...
Portable gantry crane 2 ton small mobile gantry crane with electric chain hoist
Portable gantry crane 2 ton small mobile gantry crane with electric chain hoist Product Description Portable gantry crane 2 ton small mobile gantry crane with electric chain hoist is a kind of Medium-light crane, with CD, M...
All supplier products

Same products

1.22*1.22m Panel HDG Water Tank
1.22*1.22m Panel HDG Water Tank Seller: shijiazhuang Kaixuan Victor Technology Co.,Ltd The 1.22*1.22m Panel HDG Water Tank, also known as a Hot Dip Galvanized Water Tank or Pressed S...
High Strength SMC Molded Water Tank
High Strength SMC Molded Water Tank Seller: shijiazhuang Kaixuan Victor Technology Co.,Ltd The High Strength SMC Molded Water Tank, also widely known as a GRP Water Tank, FRP water tank,...
Glass Wool Board With Facing
Glass Wool Board With Facing Seller: HEBEI LIANGPENG NEW MATERIAL CO.,LTD Glass Wool Board With Facing What is Glass Wool Board With Facing? Glass Wool BoardWith Facing ...
Brown Formaldehyde-Free Glass Wool Blanket
Brown Formaldehyde-Free Glass Wool Blanket Seller: HEBEI LIANGPENG NEW MATERIAL CO.,LTD Brown Formaldehyde-Free Glass Wool Blanket Brown formaldehyde-free glass wool blanketis eco-frie...
Glass Wool Blanket With Polypropylene Foil
Glass Wool Blanket With Polypropylene Foil Seller: HEBEI LIANGPENG NEW MATERIAL CO.,LTD Glass Wool Blanket With Polypropylene Foil What is Glass Wool Blanket With Polypropylene Facin...