900 ton erection girder railway launching girder manufacturer for precast installation
Product Description
900 ton erection girder railway launching girder manufactureris generally used in the erection of the Highway Bridge and Subway Bridge, using the precast segmental prestress concrete box beam (PC beam) assembly. The main feature is the high efficiency of construction and self-traveling. Generally it is composed of the main beam, leg and winch trolley, the main girder is used for bearing, the leg is to execute machine transverse moving, longitudinal moving, leveling, support, cross span, cross scale and other functions, and the winch trolley used for lifting the precast girder.
Packing
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying;
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.
Delivery
1.If the size of 900 ton erection girder railway launching girder manufacturer are suitable for container ship, usually by container;
2.If the size is too big, usually by bulk ship or by container after truncation; Transport ways are based on reducing cost for you and keep the crane performance.
Delivery time
Within 30 to 40 working days after the receipt of deposit.
Transportation
Generally 35 days to 50 days to destination port.
FAQ
1.What’s the information should I provide when inquiry about the900 ton erection girder railway launching girder manufacturer?
a .we need the Bridge Drawing;the Maximum longitudinal slope and the Maximum Transverse slope;
b. The Girder/beam drawing;
2.How many Personnel and equipment to assemblelaunching gantryin the worksite we need?
Personnel: 8 to 10 workers equipment:
Truck crane>50t :2 sets
Φ19.5 steel wire rope 8m:4 ropes
Sleepers:several
Electric welding machine:1set
Oxygen, acetylene:1 set
Hammer(12pound and 8pound):1 set for each
Wrench and pincher:several
Gradienter:1set
3.What are inspection standard for load test of900 ton erection girder railway launching girder manufacturer?
a. Dynamic load test
1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overhead.
b. Static load test
1.25times rated load, all mechanisms work well, the crane stops 20min to 30min as trial load is lifted 10cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation.
4.How to make highway bridge concrete girders?
a.Full span prefabrication,
b.Segment girder prefabrication
c. Full span cast in place girder
d. Segment cast in situ
5.How about maintenance of900 ton erection girder railway launching girder manufacturer?
a. Lubricating.b. Steel wire rope.c. Spreader d. Pulley blocke.Wheels f. Brake
在线联系供应商
Other supplier products
| 热卖40t轨道集装箱龙门起重机,采用国产起重机 | 产品描述 40t轨道集装箱龙门起重机 40t集装箱龙门起重机由主梁、行走小车、起重机构、小车行走机构、电气系统、操作室等组成。主要用于集装箱铁路运输领域和大型集装箱仓储领域的装卸、运输和堆垛集装箱。 包装和交付 包装: 1.电器配件采用优质胶合板板条箱包装,减少输送变形; 2.主梁、端梁、电动... | |
| 高速铁路工程用1500T分段装配式混凝土桥梁发射机 | 产品描述 采用1500T分段混凝土桥梁发射机施工预制跨度60m以上的桥梁。它的设计和制造是为了保证高性能、高效率、安全性、灵活性和多次连续使用。 ▪独立支持搬迁系统。 ▪独立的平台处理系统。 ▪维修高架起重机。 ▪所有操作的无线电遥控。 ▪无线电遥控吊具梁用于分段定位。 安全特性 对于1500... | |
| 装配300吨吊装移动脚手架系统,用于桥梁施工 | 产品描述 高架和悬挂式MSS都由一个自支撑结构和一个特定于项目的外部模板组合而成。该装配式300吨吊装活动脚手架体系可方便地适应从双T到单箱、跨度从20米到70米不等的截面。 多年来,为降低我国建筑施工人员的高成本,研制开发了300吨桥下吊装移动式脚手架系统。今天,我们的现浇桥梁MSS可以为您... | |
| 优质电动双梁磁桥起重机10t 16m售价出售 | 桥式起重机有时也称为桥式起重机和eot起重机,这是一种起重机或绞车沿着桥在平行的跑道之间移动。它们的设计是为了满足中、重型工业的起重要求,涵盖了制造过程的所有部分。 一般情况下,桥式起重机可分为单梁桥式起重机和双梁桥式起重机两种。 双梁高架起重机 与单梁桥式起重机相比,双梁桥式起重机能较好地承... | |
| Professional 260ton double truss T type beam launcher for highway bridge erection | Product Description 260ton double truss T type beam launcher for highway bridge erection is used in the erection of precast beam bridges f... |
Same products
| 1.22*1.22m Panel HDG Water Tank | 卖方: shijiazhuang Kaixuan Victor Technology Co.,Ltd | The1.22*1.22m Panel HDG Water Tank, also known as a Hot Dip Galvanized Water Tank or Pressed Stee... | |
| High Strength SMC Molded Water Tank | 卖方: shijiazhuang Kaixuan Victor Technology Co.,Ltd | The High Strength SMC Molded Water Tank, also widely known as a GRP Water Tank, FRP water tank, o... | |
| Glass Wool Board With Facing | 卖方: HEBEI LIANGPENG NEW MATERIAL CO.,LTD | Glass Wool Board With Facing What is Glass Wool Board With Facing? Glass Wool BoardWith Facing ... | |
| Brown Formaldehyde-Free Glass Wool Blanket | 卖方: HEBEI LIANGPENG NEW MATERIAL CO.,LTD | Brown Formaldehyde-Free Glass Wool Blanket Brown formaldehyde-free glass wool blanketis eco-frie... | |
| Glass Wool Blanket With Polypropylene Foil | 卖方: HEBEI LIANGPENG NEW MATERIAL CO.,LTD | Glass Wool Blanket With Polypropylene Foil What is Glass Wool Blanket With Polypropylene Facin... |