水利水电衬砌小车
PIPELINE MUNICIPAL LINING TROLLEY ADVANTAGES
1.SHORT CONSTRUCTION PERIOD
Compared with the traditional bakelite formwork and the aluminum alloy formwork, the mold is removed, the walking and the supporting form are only used for one day, the roof steel bar is tied and poured for one day, and the maintenance is carried out for three days. The normal construction can reach the standard section of a pipe gallery for five days.
2.SAVING LABOR
Pipeline municipal lining trolley construction method is replaced by manual mechanization instead of manual removal and assembly. The standard bakelite mold and....
在线联系供应商
Other supplier products
| Tunnel lining concrete grouting device | The main function of the tunnel lining concrete grouting device is to transport the concrete through the pressure of the high-pressure concrete con... | |
| DOUBLE-TRACK RAILWAY LINING TROLLEY | Use: Double-track railway lining trolley is a special equipment that must be used in the secondary lining of the double-track railway tunnel constr... | |
| Tunnel concrete maintenance formwork | The tunnel concrete maintenance formwork independently developed by our company is mainly composed of work bench, high pressure spray health syst... | |
| Single-track railway lining trolley | Single-track railway lining trolley is a special equipment that must be used in the secondary lining of single-track railway tunnel construction. I... | |
| Secondary grouting machine | Secondary grouting machine technology to take holes in the center line of the lining trolley vault, install the fixing flange and the positioning f... |
















