水利水电衬砌小车
PIPELINE MUNICIPAL LINING TROLLEY ADVANTAGES
1.SHORT CONSTRUCTION PERIOD
Compared with the traditional bakelite formwork and the aluminum alloy formwork, the mold is removed, the walking and the supporting form are only used for one day, the roof steel bar is tied and poured for one day, and the maintenance is carried out for three days. The normal construction can reach the standard section of a pipe gallery for five days.
2.SAVING LABOR
Pipeline municipal lining trolley construction method is replaced by manual mechanization instead of manual removal and assembly. The standard bakelite mold and....
在线联系供应商
Other supplier products
| SINGLE-TRACK RAILWAY LINING TROLLEY | Single-track railway lining trolley is a special equipment that must be used in the secondary lining of single-track railway tunnel construction. I... | |
| Tunnel formwork bypass channel | The tunnel formwork channel is a non-standard product specially designed and manufactured for the concrete lining of water tunnels such as tunnels ... | |
| Hydraulic inverting bridge formwork | Hydraulic inverting bridge formwork solves the problems of inconvenient, poor adaptability, low efficiency and low safety protection facilities in ... | |
| Lining trolley plug steel template | During the pouring process of the second lining concrete, one side of the two ends of the trolley is in contact with the already formed concrete, a... | |
| DOUBLE-TRACK RAILWAY LINING TROLLEY | Use: Double-track railway lining trolley is a special equipment that must be used in the secondary lining of the double-track railway tunnel constr... |
















