Tanzania Mnazi Bay Submarine/Offshore Pipeline Laying Project (Year 2014)

Project Introduction:Part of gas pipeline crossing Mnazi Bay, shallow water area is 2.2km, total length is 16km.

Work Scope:(float laying method), pre/post-trenching, pipeline pulling and landing.



在线联系供应商

至: Tianjin Timeast Offshore Engineering Co., Ltd.
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

Boxi and Gaoshaling Oil & Gas Treatment Plant Pipeline Recovery Project (Year 2018)
Boxi and Gaoshaling Oil & Gas Treatment Plant Pipeline Recovery Project (Year 2018) Project Introduction: Abandoned 8”mixed transportation pipeline and 12” natural gas submarine/offshore pipeline of Boxi treatment pl...
Philippines 20MW [Net] Steam Turbine Genset Project (Year 2017-2018)
Philippines 20MW [Net] Steam Turbine Genset Project (Year 2017-2018) Project Introduction:20MW [Net] Steam Turbine Genset Project is located in Lafarge cement plant in Iligan, North Mindanao, Philippines. The cons...
Ma Mu & Yu Shan Islands Submarine/Offshore Pipelines Installation Project (Year 2018)
Ma Mu & Yu Shan Islands Submarine/Offshore Pipelines Installation Project (Year 2018) Project Introduction:Horizontal pipelifting; Inclined riser integrally lifting and overall lower down work after tie-in; Two crude oil submarin...
CFD11-2 Offshore/Subsea Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO (Year 2007-2008)
CFD11-2 Offshore/Subsea Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO (Year 2007-2008) CFD11-2 Offshore/, Repair and Installation between SPM and FPSO (Year 2007-2008) Project Introduction: -Jumper Hose Parameter: ø 24”...
Huludao Island & Juehuadao Island Water Supply Pipeline Project (Year 2017.10)
Huludao Island & Juehuadao Island Water Supply Pipeline Project (Year 2017.10) Huludao Island & Juehuadao Island (Year 2017.10) Project Introduction:This project is water supplying from land to offshore island.Pipeline t...
供应产品

Same products

中国-俄罗斯铁路运输最快10天到达
中国-俄罗斯铁路运输最快10天到达 卖方: 成都大洋供应链管理有限公司 西安-阿拉山口-莫斯科
中国-俄罗斯铁路运输最快10天到达
中国-俄罗斯铁路运输最快10天到达 卖方: 成都大洋供应链管理有限公司 西安-阿拉山口-莫斯科
中国-俄罗斯铁路运输最快10天到达
中国-俄罗斯铁路运输最快10天到达 卖方: 成都大洋供应链管理有限公司 西安-阿拉山口-莫斯科
NITROGEN CABINET
NITROGEN CABINET 卖方: Kunshan Gaoqiang Industrial Equipment Co.,Ltd Dryzone dry nitrogen box has a fast recovery time which is important for some industry demand, es...
Guitar Dry Cabinet
Guitar Dry Cabinet 卖方: Kunshan Gaoqiang Industrial Equipment Co.,Ltd To give performers a better storage environment, Dryzone provides quality dry cabinets for instru...