JZ9-3 Oil Field Platform Anti-Icing Design, Fabrication and Installation (Year 2009)
Project Introduction:JZ9-3 oil field Jacket anti-icing destroyed seriously.
Work Scopeof :Structure re-design, fabrication, site installation, cable protection pipe and pipe clip installation.
在线联系供应商
Other supplier products
CFD11-2 Offshore/Subsea Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO (Year 2007-2008) | CFD11-2 Offshore/, Repair and Installation between SPM and FPSO (Year 2007-2008) Project Introduction: -Jumper Hose Parameter: ø 24”... | |
Huludao Island & Juehuadao Island Water Supply Pipeline Project (Year 2017.10) | Huludao Island & Juehuadao Island (Year 2017.10) Project Introduction:This project is water supplying from land to offshore island.Pipeline t... | |
Liaobin Submarine/Offshore Pipeline Post-Trenching Project (Year 2016) | Project Introduction:9.4km submarine/offshore pipeline post-trenching. | |
Zhaodong Oil Submarine/Offshore Pipeline Post-Trenching Project (Year 2010) | Zhaodong Oil Submarine/(Year 2010) Project Introduction:1.7km submarine/offshore pipeline post-trenching. | |
Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/Subsea Production Platform A1,A2, Design, Fabrication and Site Installation | Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/A1,A2, Design, Fabrication and Site Installation Project Introduction:Jacket leg was ser... |
Same products
中国-俄罗斯铁路运输最快10天到达 | 卖方: 成都大洋供应链管理有限公司 | 西安-阿拉山口-莫斯科 | |
中国-俄罗斯铁路运输最快10天到达 | 卖方: 成都大洋供应链管理有限公司 | 西安-阿拉山口-莫斯科 | |
中国-俄罗斯铁路运输最快10天到达 | 卖方: 成都大洋供应链管理有限公司 | 西安-阿拉山口-莫斯科 | |
NITROGEN CABINET | 卖方: Kunshan Gaoqiang Industrial Equipment Co.,Ltd | Dryzone dry nitrogen box has a fast recovery time which is important for some industry demand, es... | |
Guitar Dry Cabinet | 卖方: Kunshan Gaoqiang Industrial Equipment Co.,Ltd | To give performers a better storage environment, Dryzone provides quality dry cabinets for instru... |