200 Type Bailey Panel
Specifications1. Panel Bridge 2. Factory provided directly 3. Manual handling 4.Quickly installIt is the main bearing of structure steel bridge It is composed of an upper, lower chord, vertical bars and diagonal rods welded together, the end of bottom chord of yin and Yang joint, joint is connected with a truss pin hole. Truss chord is composed of two 10 channel (back to back) and, in the lower chord, a plurality of perforated steel plate welding, bolt holes and the reinforcing chord and double truss connected on, bottom chord, the chord is used to connect the frame four bolt holes the two hole, which is for the double row or more truss with internode connection, by two holes at both ends of the cross section is connected with the. Multiple rows of truss as beams or columns when in use, must be engaged with a supporting frame of the upper and lower sections of the truss reinforcement. In the lower chord rod, is provided with 4 beam plate, a tenon above, used for fixing the beam in the plane of the position: in the lower chord rod end of steel web is provided with two elliptical holes, for connecting wind pull rod.
Other supplier products
|
|
Specifications1 To support Bailey decking System 2 To connect chords and panels 3 Commonly used in steel bridge 4 Bailey bridgePanel bolt used to c... |
|
Reinforced Concrete Bridge |
Product Description1.Material: (1) cold rolled steel ribbed rebar(2) cold rolled steel round rebar(3) hot rolled steel ribbed rebar2.Wire Diameter:... |
|
Bridge Bearing Pad |
SpecificationsHigh quality cheap bridge bearing pad 1. NR, CR, NBR, SBR, VITON, EPDM, HNBR, SILICONE, BUNA, 2. ISO9001
MaterialsNR, NBR... |
|
Steel Frame |
SpecificationsSteel frame is painted two coats: ban to rust and paint color. Thickness of steel tubes is 6- 25 mmPerfect design completely avoids l... |
|
River Bridge |
Specifications1.military structured 2.conveniently transported 3.rapid erection/easy assembled/fast installed 4 huge load5.Long service life6.stron... |
供应产品
Same products