Green Formwork Aluminium Slab Formwork for No Beam or Less Beam Structure
Green formwork is a simple panel&prop system with early stripping mechanism,it consists only of three basics components:
1.the steel of aluminium framing main panels with bamboo plywood surface
2.The adjustable steels prop with early-stripping head
3.The auxiliary infill or bridge beams
All basic metal parts are made of high quality grade Q345B steel material,all metal surface are treated with electrophoresis.
Other supplier products
|
Green Formwork Aluminium Slab Formwork for No Beam or Less Beam Structure |
Green formwork is a simple panel&prop system with early stripping mechanism,it consists only of three basics components: 1.the steel of alumini... |
|
agriculture roller ring casting Cambridge Wheels |
Material: Grey cast iron GG20,GGG25,GGG40,GGG50, GGG60 CASTING STEEL C25 TO C45Qingdao Scaffolding Co., Ltd. is the biggest manufacturer and export... |
|
QSRound Universal Scaffolding with Load Class 2-6 |
The universal scaffolding system QSRound is constructed by prefabricated steel components. Standards, ledgers, U-transoms, and diagonal braces that... |
|
Ringlock Scaffolding System Steel qs-round products |
The universal scaffolding system QSRound is constructed by prefabricated steel components. Standards, ledgers, U-transoms, and diagonal braces that... |
|
Green Formwork Steel panel-prop system with early stripping mechanism |
Green Formwork is an advance Panel -Prop formwork system which allow EARLY STRIPPING PROCESS. It provides a suitable formwork solution to most conc... |
供应产品
Same products