.

Waste Heat Recovery Boiler For Billet Reheating Furnace

Waste Heat Recovery Boiler for Billet Reheating FurnaceNecessityThe steel rolling process consumes a tremendous amount energy,Website:, for which the average thermal efficiency is only 20% ~ 30%. Around 70% ~ 80% of the entire energy input required for such process has traditionally been lost in the environment, and at least 30% of this lost energy is carried by flue gas. Especially for steel rolling mills without a regenerative combustion system, it is important to recover the waste heat from the flue gas coming out of the billet reheating furnace. Design Ingenuity Due to the wild fluctuation of gas quantity and temperature, the reheating furnace is required to have absolute control over the furnace pressure. Our waste heat recovery system for this application adopts sealed header structure, in which surface area employs a unique multi-free-end-surface design allowing it to stretch flexibly within a safe interval as the heat expansion frequently takes its place. Due to our rich R & D experience in waste heat recovery technologies, the gas velocity is optimized for the full control of gas-side resistance force. The average investment recovery period is around 4 years.  Key Parameters 1 T of billets = 50 KG ~ 60 KG of steam output Working pressure: 0.8 MPA ~ 2.0 MPASteam temp: 320 ℃ (saturated temp)PROJECT WASTE HEAT RECOVERY IN BILLET REHEATING FOR:BAOSTEEL GROUP - STAINLESS STEEL DIVISIONRated steam output: 3.6 T / H @ 1.8 MPA Rated steam temp: 300 Deg Celsius


在线联系供应商

至: JSDJ HEAVY INDUSTRY CO., LTD.
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

Boiler Serpentine CoilsBoiler serpentine coils are processed by advanced automatic assembly line technology,Website:, from tube-polishing to the fi...
Pyrite Roasting Waste Heat Recovery BoilerNecessitySulfuric acid is one of the most important raw material for many industries,Website:, and a nati...
Sinter Cooler Waste Heat Recovery BoilerNecessitySinter Cooler process is highly energy consuming and it accounts for 10% of the entire energy inpu...
Spent Acid Waste Heat BoilerNecessitySulfuric acid is one of the most important raw material for many industries,Website:, and a nation's sulfuric ...
Gas turbine heat recovery steam generator NecessityOver the past decade,Website:, more and more gas turbine power plant owners in developing nation...
供应产品

Same products

2BV6161 Liquid Ring Vacuum Pump
2BV6161 Liquid Ring Vacuum Pump 卖方: Greentech International (Zhangqiu) Co., Ltd 2BV6161 Liquid Ring Vacuum Pump2BV series liquidring vacuum pumps are suitable for pumping the ga...
2BV6131 Liquid Ring Vacuum Pump
2BV6131 Liquid Ring Vacuum Pump 卖方: Greentech International (Zhangqiu) Co., Ltd 2BV6131 Liquid Ring Vacuum Pump2BV series liquidring vacuum pumps are suitable for pumping the ga...
2BV6121 Liquid Ring Vacuum Pump
2BV6121 Liquid Ring Vacuum Pump 卖方: Greentech International (Zhangqiu) Co., Ltd 2BV6121 Liquid Ring Vacuum Pump2BV series liquidring vacuum pumps are suitable for pumping the ga...
2BV6111 Liquid Ring Vacuum Pump
2BV6111 Liquid Ring Vacuum Pump 卖方: Greentech International (Zhangqiu) Co., Ltd 2BV6111 Liquid Ring Vacuum Pump2BV series liquidring vacuum pumps are suitable for pumping the ga...
2BV5161 Water Ring Vacuum Pump
2BV5161 Water Ring Vacuum Pump 卖方: Greentech International (Zhangqiu) Co., Ltd 2BV5161 water ring vacuum pump2BV series liquidring vacuum pumps are suitable for pumping the gas...