Muck loader Coal loader,Mining machinery ZWY-60/30;
The crawler muck loader for big slope is mainly used in the drilling of mine roadway and semi-coal roadway, and the slope angles should be equal to or less than 28°. Also, this kind of type belt haggloader can be applied in the loading operation of railway tunnel construction and national caves construction. Worked with the colliery hydraulic drilling machine, the crawler muck loader for big slope can achieve the mechanized operation of colliery drilling. By improving its drilling speed, it can be used in the large-scale section.
Features:
(1) The crawler muck loader for big slopes has strong loading capacity. By adopting crawler belt, it is easy to adjust the tension of the crawler attachment. At the same time, by using the study and durable excavator parts such as teeth, the product had a good inter-convertibility.
(2)The conveyor can discharge rock into the auto dumper, shuttle car, side-dumping car, belt conveyor, skip and other transportation equipments. The dumping height is designed according to the requirements of our customers.
(3)The major movement of this crawler much loader is controlled by the pilot value, and this loading machinery works flexibly and can be operated easily. It also has a good climbing capacity and can work without impact.
(4)By installing the hydraulic hammer, we can break, repair, and blast the huge rock and coal sheet on the roadway base plate or on the bottom of the side-panel
(5) The working surfaces of this crawler muck loader will be cleaned automatically by itself.
Technical parameter
Item |
Unit |
ZWY-60/30L |
|
Digging width |
mm |
2300 |
|
Digging height |
mm |
2100 |
|
Dumping height |
mm |
1350 |
|
Dumping distance |
mm |
1550 |
|
Digging depth |
mm |
320 |
|
Conveyor inner width |
mm |
450 |
|
Track outside/inside width |
mm |
1500/900 |
|
Scraper chain |
single |
||
Aggregate plate width |
mm |
1660 |
|
Speed of scraper chain |
m/s |
||
System pressure |
Mpa |
||
Oil temperature of work |
℃ |
≤80 |
|
Weight |
t |
≤7.0 |
|
Overall dimension |
L |
mm |
6030 |
W |
mm |
1660 |
|
H |
mm |
1900 |
|
mm |
300 |
||
Grade ability |
° |
<20 |
|
Main motor |
KW |
30KW/380V(660/1140) |
|
Track gauge |
mm |
600 |
|
Adaptive tunnel dimension(W*H) |
m |
在线联系供应商
Other supplier products
Underground | JXQ mining skip is inclined front dumping skip .It’s simple construction, short dumping distance, and big capacity. When JXQ mining skip elev... | |
Underground | Specifications 2. High efficiency and safe 3.best configurations and long service life Description: This underground of this tunneling machine m... | |
Muck loader Coal loader,Mining machinery ZWY-60/30; | The tracked excavating loader is also known as tracked haggloader or mining track loader, and it is mainly used in mine, railway tunnel, national d... | |
Muck loader Coal loader,Mining machinery ZWY-60/30; | The crawler muck loader for big slope is mainly used in the drilling of mine roadway and semi-coal roadway, and the slope angles should be equal to... | |
Muck loader Coal loader,Mining machinery ZWY-60/30; | Basic introduction: Shuttle car (it’s also called mobile gangue storage in coal mine) is a high-efficient gangue transport device, mainly use... |
Same products
On/Off Metal 852011 Metal RFID Tag | 卖方: Invengo Information Technology Co.,Ltd. | Metal Mount RFID Tags Demension 85 x 20 x 11 mm XCTF-852011-EU (Monza 4QT) XCTF-852011-FCC... | |
Sterilization Tray | 卖方: Tangshan UMG Medical Instrument Co.,Ltd. | It is used for disinfection of conventional instruments. Material Model Material Of Steriliz... | |
Steel Sheet | 卖方: STEEL SEARCHER HONG KONG LIMITED | The steel plateis a flat steel that is cast with molten steel and pressed after cooling. Accordin... | |
Stainless Steel Pressure Fittings | 卖方: DONGGUAN SIBAI METAL WORKS LIMITED | Stainless Steel Pressure Fittings Sibai produced a lot of stainless steel high pressure pipe fit... | |
METAL STAMPING | 卖方: Wuhu Hunkmachining Accessory CO.,Ltd | Stamping is a cold stamping process, which is to cut, bend or shape the material into the finishe... |