Lamp Start, Run-up Time and Flicker Test System
The system is designed according to BASIC, Energy Star V2.1, IEC-Pst, CA CEC, ASSIST, CIE SVM and IEEE Std 1789, it used to test the Flicker test, Start and Run-up time (work with LSP-500VAC) for the LED lamp, CFL and all other luminaires
Other supplier products
|
|
Electrostatic Discharge Simulator |
According to IEC61000-4-2, EN61000-4-2 and GB/T17626.2. Output voltage is 0~20KV. Contact and Air Discharges test mode. The big LCD screen can be t... |
|
|
High and Low Temperature Humidity Chamber |
It is according to IEC60068-2-1 and IEC60068-2-2. The temperature range is -40~150℃ and humidity is 30%~98%RH with programmable function. The worki... |
|
|
Electrodynamic Vibration Generator System |
The system according to IEC60068, IEC68-2-6, JJG189-97, GB/T13309-91, GB2423. Include vertical testing table and horizontal testing function. Max t... |
|
|
Lamp Start, Run-up Time and Flicker Test System |
The system is designed according to BASIC, Energy Star V2.1, IEC-Pst, CA CEC, ASSIST, CIE SVM and IEEE Std 1789, it used to test the Flicker test, ... |
|
|
Environmental Test Chamber |
The working size is 1200*800*500mm. It is according to IEC60068-2-11, IEC 60068-2-52 and other standards. |
All supplier products
Same products