.

Full Vehicle Sunlight Simulation Test Chamber

Get a quote:

Whats/App: +86 181 0160 0864

The Full Vehicle Sunlight Simulation Test Chamber is a high-precision environmental testing facility designed to replicate intense solar radiation and extreme climate conditions. By integrating a full-spectrum lighting system with precise temperature and humidity controls, this chamber allows you to evaluate how entire vehicles or large-scale automotive components respond to prolonged sunlight exposure. It provides a controlled laboratory environment to assess material degradation, thermal expansion, and functional reliability under peak solar loads.

Applications

Full Vehicle Sunlight Simulation Test Chamber is designed to evaluate the aging performance of complete assemblies or entire vehicles under sunlight exposure. Users can assess changes in performance after irradiation, including alterations in shape, color, gloss, texture, strength, and various thermal expansion results. Additionally, it tests key metrics such as vehicle starting capability, motor performance, and overall air conditioning functionality under solar radiation.

Standards

GB/T 12535-2007 Test Methods for Starting Performance of Automobiles

GB 11556-2009 Defrosting and Demisting Test

GB/T 18297-2001 (Reference) Motor Performance Test

GB/T 2423.24-1995 Solar Radiation Test

GB/T 2423.3-2006 Test Method for Constant Humidity and Heat

GB/T 12782-2007 Requirements and Test Methods for Automotive Heating Performance

QC/T 658-2000 Test Method for Automotive Air Conditioning System Performance

Features

1. This vehicle-level solar simulation test chamber is designed for performance testing of electric vehicles with motor power ≤150kW, providing environmental simulation conditions ranging from -20°C to +60°C.

2. Functionality and volume can be customized according to different vehicle models and testing standards.

Parameters

CategorySpecifications
Temperature Control Range -20°C ~ +60°C
Humidity Range Relative humidity: 30% ~ 95%, no condensation in the low-temperature test chamber• Without illumination: 30% ~ 95% RH• With illumination: 30% ~ 80% RH
Condition Control a. Cooling Time• 25°C ~ -20°C: ≤ 85 min (no load)• 60°C ~ 25°C: ≤ 40 min (no load)b. Heating Time• -20°C ~ 25°C: ≤ 50 min (no load)• 25°C ~ 60°C: ≤ 50 min (no load)c. Temperature Fluctuation• ≤ ±0.5°C (no load)d. Temperature Uniformity• ≤ ±1.5°C (no load)e. Temperature Deviation• ≤ ±2.0°C (with load, measured at vehicle front air inlet, roof, left and right sides)
Illumination System a. Infrared Radiation Lamps• Working ambient temperature: -20°C ~ 60°C• Maximum radiation intensity: 1200±25W/m², uniformity: ±10%• Adjustment range: 30% ~ 100%b. Simulated Lamps• Uses two-terminal linear medium-wave infrared simulation lamps• Service life: ≥ 5000h (radiation intensity remains stable during this period)c. Illumination Adjustment• Automatically and manually adjustable via temperature control on the vehicle surfaced. Projection Area & Movement• Projection area: 5000mm × 2500mm (L×W)• Vertical movement distance: Minimum 2200mm, maximum 3000mm (distance from the lower surface of the lamp to the chamber bottom)

Accessories

1.Solar Simulation Array: Vertically adjustable lamp rack with medium-wave IR lamps.

2.Humidity Control System: Includes a high-pressure water spray and dehumidification unit.

3.Sensor Package: High-precision temperature and humidity sensors, plus pyranometers for radiation monitoring.

4.Vehicle Interface Port: Sealed pass-throughs for vehicle exhaust and data cables.

5.Safety System: Over-temperature protection, emergency stop, and smoke detection alarms.

Test Procedures

1. Equipment and Sample Preparation

Equipment Inspection: Verify that the solar simulator chamber's irradiance (1000 W/m²), temperature (-40°C to 110°C), humidity (5%–95% RH), and air velocity (0.5–10 m/s) parameters comply with standards.

Sample Installation: Position the test vehicle at the chamber center, ≥0.3m from chamber walls, with ≥0.76m distance from radiation lamps.

2. Test Implementation

Cycle Test:

Cycle Count: Minimum 3 cycles, maximum 7 cycles, each lasting 24 hours.

Irradiance Control: Adjust in segments or continuously to maintain constant total energy.

Temperature Regulation: Set ambient and radiation temperatures according to test requirements.

Humidity Regulation: Control surface humidity via a water spray system.

Steady-State Test:

Cycle Count: Determined by exposure duration (e.g., 4 cycles for a 10-day test).

Parameter Settings: Maintain stable irradiance, temperature, and humidity.

3. Performance Testing

Initial Inspection: Record specimen appearance, temperature sensor data, and operational performance before testing.

Intermediate Inspection: Conduct visual inspection, dimensional measurement, and electrical testing at peak temperature.

Final Inspection: Evaluate performance changes post-testing to ensure compliance with product specifications.


Отправить запрос, связаться с поставщиком

Кому: Standard Group (Hong Kong) Limited
Ваш E-mail:
Текст письма:


Send to other suppliers

Другие товары поставщика

Slip Resistance Tester ASTM F2913
Slip Resistance Tester ASTM F2913 Introduction Slips and trips are the most common cause of major injuries at work and can happen almost anywhere-broken bones and other serious inj...
Catheter Friction Tester / Catheter Friction Equipment
Catheter Friction Tester / Catheter Friction Equipment Standard YY/T 1536 - 2017 TCAMDI 021 - 2019 Main Uses The catheter friction performance tester is a professional instrument used to detect the ...
Nasal Oxygen Cannula Tester YY/T 1543
Nasal Oxygen Cannula Tester YY/T 1543 Introduction The Nasal Oxygen Tube Tester plays a crucial role in the medical field. The following is a detailed introduction to its main uses, co...
Absolute Method Retro-Reflective Coefficient Tester
Absolute Method Retro-Reflective Coefficient Tester Get a quote: Whats/App: +86 181 0160 0864 The Absolute Method Retro-Reflective Coefficient Tester is a precision instrument designed to evaluate ...
Safety Helmet Electrical Insulation Tester
Safety Helmet Electrical Insulation Tester Get a quote: Whats/App: +86 181 0160 0864 Web: gellowen.co.uk The Safety Helmet Electrical Insulation Tester is designed to assess the electrica...
Все товары поставщика

Похожие товары

Common Rail Injector Valve F00R J02 012
Common Rail Injector Valve F00R J02 012 Продавец: 868983 Common Rail Injector Valve F00R J02 012 David Chen
Common Rail Injector Valve F00R J02 005
Common Rail Injector Valve F00R J02 005 Продавец: 868983 Common Rail Injector Valve F00R J02 005 David Chen
Common Rail Injector Valve F00R J01 941
Common Rail Injector Valve F00R J01 941 Продавец: 868983 Common Rail Injector Valve F00R J01 945 David Chen
Common Rail Injector Valve F00R J01 941
Common Rail Injector Valve F00R J01 941 Продавец: 868983 Common Rail Injector Valve F00R J01 941 David Chen
Common Rail Injector Valve F00R J01 924
Common Rail Injector Valve F00R J01 924 Продавец: 868983 Common Rail Injector Valve F00R J01 924 David Chen