500kV Mobile Lab for CT/VT measurement test

500kV Mobile Lab for CT/VT measurement test

500kVCT&PTmobile labis made up ofa truck for 220kV CT&PT error test, a 500kV van-typetrailer,test equipment and instruments(includingstandard PT and step-up transformer integrated equipment, strong current generator, standard CT, compensationreactor, compensation capacitor, comparator, integrated control device and so on). The whole set of equipmentcando power frequency step-up and error test for PTof500kV&below. And alsocandostrongcurrent and error test for CT of 3000A &below.This mobile lab can be moved and expanded based on test siteconditions, can do siteerror testby integrated control device for electromagnetic PT, capacitance PT, CT of500kV&below.

220kV test truck can do error test for 220kV&below CT/PT.

220kV test truck and 500kV trailer working together, can do error test for 500kV CT/PT.

Functionsofmobile lab.

CT/PT mobile lab.can adapttomany kinds ofsite conditions. Itcan expandby auto andbymanual, after the expansion,it can meet with the safety insulation distance which test voltage need.Expansion and movement of Test platform can be completed by hydraulic , also can be by manual. Test truck and test trailer share one set of error test equipment. The details are as below.

  1. 220kVStandard PT and step-up transformer integrated equipment is placed in the middle of cabin, compensation reactor and voltage regulatorareevenly placedincabin, thus meeting with the balance of weight.There’s a specialtrack(Steel tank structure)laying on the bottom plate of cabin,andon thistrack, there’s a tray for placingstandard PT and step-up transformer integrated equipment.Betweenthetrack and tray, there’re special positioning device and fast connection&separation device, convenient to disassembly.During test,220kVStandard PT and step-up transformerintegrated equipmentcanbemovedfromfront to backbyhydraulic.Strong current generatoris in the right middle of cabin, where has a transferring door.Standard CT is in the back of cabin, when do error test for CT, it can be moved out to do test by small electric crane.
  2. Inside test trailer, there’s a test platform which have 500kV standard PTandstep-up transformerintegrated equipment. There’s a specialtrack(Steel tank structure)laying on the bottom plate oftrailer,andon thistrack, there’s a tray for placingstandard PT and step-up transformer integrated equipment.Betweenthetrack and tray, thereare special positioning device and fast connection&separation device, convenient to disassembly.During test,500kVStandard PT and step-up transformerintegrated equipmentcanbemovedfromfront to backbyhydraulic.
  3. In both of truck and trailer, all moving mechanismis set up with stop-gear to ensure the accurate place and fixing safetyof test equipment.After movement, it can meet with the safety insulation distance.
  4. whenauto-operationaccidentorfailure occurs,there’re alsocorresponding manual operation and emergencypower supplyon both of truck and trailer.
  5. Forsite error testof all kinds of 6kV-35kV PT,use0~70kVstep-up source and 6kV~35kVstandard PT, which are installed in 220kV test truck, but can be moved out to use by small electric crane.
  6. es have obvious marksand paste wiring diagram, schematic diagram and use instructions at corresponding position.
  7. In both of truck and trailer, there’s special electric transfer box on side wall. When test, just connect wires to corresponding terminals according to test requirements, then can do test.

Send product request

To: CNME Intermational Co.Ltd
Your E-mail:
Message text:


Send to other suppliers

Other supplier products

Shielding hall of HV PD test
Shielding hall of HV PD test Shielding hall of HV PD test Application: HV test shielding room (faraday cage) areWidely used in power cable, transformer, transformer switch, tra...
Digital partical discharge detector
Digital partical discharge detector Digital partical discharge detector Features ²ØWith anti-interference mode, which is unique in China, so that to attenuate space interf...
HV Large Capacity Testing Station design
HV Large Capacity Testing Station design HV Large Capacity Testing Station design We will be willing to provide whole-process engineering consulting servicesfor you: Preparingfeasibility s...
faraday cage of HV transformer PD test
faraday cage of HV transformer PD test faraday cage of HV transformer PD test Application: HV test shielding room (faraday cage) areWidely used in power cable, transformer, transformer s...
DC voltage test system
DC voltage test system DC voltage test system DC test systems are used to test components and complete systems found in electrical power supply systems and operating on D...
All supplier products

Same products

Amorphous Alloy Type Transformer Iron Core
Amorphous Alloy Type Transformer Iron Core Seller: Shijiazhuang Tianya Electric Co., LTD Amorphous Alloy Type Transformer Iron Core -The iron coreis made of high magnetic conductivity m...
10kv Dry Type Epoxy Resin Cast Power Transformer
10kv Dry Type Epoxy Resin Cast Power Transformer Seller: Shijiazhuang Tianya Electric Co., LTD 10kv Dry Type Epoxy Resin Cast Power Transformer Epoxy resin cast dry-type transformeris a high-...
HM B200/B210 Series
HM B200/B210 Series Seller: BEIJING HIGHMESH INFORMATION TECHNOLOGY CO.,LTD. HM B200/B210 Series USRP B200/B210 Product Overview The B200 and B210 hardwarecovers RF frequen...
HM-B210(Single-Board)
HM-B210(Single-Board) Seller: BEIJING HIGHMESH INFORMATION TECHNOLOGY CO.,LTD. HM-B210(Single-Board) Description TheB210is a highly integrated Universal Software Radio Periph...
Busbar systems
Busbar systems Seller: Jinan Dema Electric Co., Ltd. Busbar systems Busbar Systems for Plant Reliable Industrial Power Distribution Solutions for Fa...