500kV Mobile Lab for CT/VT measurement test
500kV Mobile Lab for CT/VT measurement test
500kVCT&PTmobile labis made up ofa truck for 220kV CT&PT error test, a 500kV van-typetrailer,test equipment and instruments(includingstandard PT and step-up transformer integrated equipment, strong current generator, standard CT, compensationreactor, compensation capacitor, comparator, integrated control device and so on). The whole set of equipmentcando power frequency step-up and error test for PTof500kV&below. And alsocandostrongcurrent and error test for CT of 3000A &below.This mobile lab can be moved and expanded based on test siteconditions, can do siteerror testby integrated control device for electromagnetic PT, capacitance PT, CT of500kV&below.
220kV test truck can do error test for 220kV&below CT/PT.
220kV test truck and 500kV trailer working together, can do error test for 500kV CT/PT.
Functionsofmobile lab.
CT/PT mobile lab.can adapttomany kinds ofsite conditions. Itcan expandby auto andbymanual, after the expansion,it can meet with the safety insulation distance which test voltage need.Expansion and movement of Test platform can be completed by hydraulic , also can be by manual. Test truck and test trailer share one set of error test equipment. The details are as below.
- 220kVStandard PT and step-up transformer integrated equipment is placed in the middle of cabin, compensation reactor and voltage regulatorareevenly placedincabin, thus meeting with the balance of weight.There’s a specialtrack(Steel tank structure)laying on the bottom plate of cabin,andon thistrack, there’s a tray for placingstandard PT and step-up transformer integrated equipment.Betweenthetrack and tray, there’re special positioning device and fast connection&separation device, convenient to disassembly.During test,220kVStandard PT and step-up transformerintegrated equipmentcanbemovedfromfront to backbyhydraulic.Strong current generatoris in the right middle of cabin, where has a transferring door.Standard CT is in the back of cabin, when do error test for CT, it can be moved out to do test by small electric crane.
- Inside test trailer, there’s a test platform which have 500kV standard PTandstep-up transformerintegrated equipment. There’s a specialtrack(Steel tank structure)laying on the bottom plate oftrailer,andon thistrack, there’s a tray for placingstandard PT and step-up transformer integrated equipment.Betweenthetrack and tray, thereare special positioning device and fast connection&separation device, convenient to disassembly.During test,500kVStandard PT and step-up transformerintegrated equipmentcanbemovedfromfront to backbyhydraulic.
- In both of truck and trailer, all moving mechanismis set up with stop-gear to ensure the accurate place and fixing safetyof test equipment.After movement, it can meet with the safety insulation distance.
- whenauto-operationaccidentorfailure occurs,there’re alsocorresponding manual operation and emergencypower supplyon both of truck and trailer.
- Forsite error testof all kinds of 6kV-35kV PT,use0~70kVstep-up source and 6kV~35kVstandard PT, which are installed in 220kV test truck, but can be moved out to use by small electric crane.
- es have obvious marksand paste wiring diagram, schematic diagram and use instructions at corresponding position.
- In both of truck and trailer, there’s special electric transfer box on side wall. When test, just connect wires to corresponding terminals according to test requirements, then can do test.
在线联系供应商
Other supplier products
| Mobile substation | Mobile substation Performance characteristics ① Rapid allocation: connections between equipments are connected .After connected to earth system and... | |
| CT & VT Accuracy Measurement Testing System----General Type | CT & VT Accuracy Measurement Testing System----General Type Ratio Error and Phase Error of the CT& PT HES Series Control Bench HES-1C ... | |
| DC voltage test system | DC voltage test system DC test systems are used to test components and complete systems found in electrical power supply systems and operating on D... | |
| SF6 reference Capacitor - 400kV 50pF compressed gas standard capacitor | Genneal Information: Compressed air standard capacitor is a necessary instrument in every HV test lab. It is used to measure the capacitance of cap... | |
| faraday cage of HV transformer PD test | faraday cage of HV transformer PD test Application: HV test shielding room (faraday cage) areWidely used in power cable, transformer, transformer s... |
Same products
| Air insulated Dry type transformer VPI | 卖方: TAILI ELECTRIC CO.,LTD. | Air insulated Dry type transformer VPI TAILI SG(B) air-barrier dry-type transformer( VPI) is des... | |
| Cast Resin Dry Type Transformer with Cooling Fan | 卖方: TAILI ELECTRIC CO.,LTD. | Cast Resin Dry Type Transformer with Cooling Fan Taili’s advanced epoxy resin casting proc... | |
| 1250kVA Dry type Transformer for Bangladesh | 卖方: TAILI ELECTRIC CO.,LTD. | 1250kVA Dry type Transformer for Bangladesh Taili's advanced epoxy resin casting process ensures... | |
| 35kV Dry-type transformer with OLTC | 卖方: TAILI ELECTRIC CO.,LTD. | 35kV Dry-type transformer with OLTC Taili's35kV Dry-type Transformer with OLTC (On-Load Tap Chan... | |
| Cast Resin Dry Type Transformer | 卖方: TAILI ELECTRIC CO.,LTD. | Cast Resin Dry Type Transformer IEC/ANSICast Resin TransformersfromTAILI Electric, is difference... |















