.

500kV Mobile Lab for CT/VT measurement test

500kV Mobile Lab for CT/VT measurement test

500kVCT&PTmobile labis made up ofa truck for 220kV CT&PT error test, a 500kV van-typetrailer,test equipment and instruments(includingstandard PT and step-up transformer integrated equipment, strong current generator, standard CT, compensationreactor, compensation capacitor, comparator, integrated control device and so on). The whole set of equipmentcando power frequency step-up and error test for PTof500kV&below. And alsocandostrongcurrent and error test for CT of 3000A &below.This mobile lab can be moved and expanded based on test siteconditions, can do siteerror testby integrated control device for electromagnetic PT, capacitance PT, CT of500kV&below.

220kV test truck can do error test for 220kV&below CT/PT.

220kV test truck and 500kV trailer working together, can do error test for 500kV CT/PT.

Functionsofmobile lab.

CT/PT mobile lab.can adapttomany kinds ofsite conditions. Itcan expandby auto andbymanual, after the expansion,it can meet with the safety insulation distance which test voltage need.Expansion and movement of Test platform can be completed by hydraulic , also can be by manual. Test truck and test trailer share one set of error test equipment. The details are as below.

  1. 220kVStandard PT and step-up transformer integrated equipment is placed in the middle of cabin, compensation reactor and voltage regulatorareevenly placedincabin, thus meeting with the balance of weight.There’s a specialtrack(Steel tank structure)laying on the bottom plate of cabin,andon thistrack, there’s a tray for placingstandard PT and step-up transformer integrated equipment.Betweenthetrack and tray, there’re special positioning device and fast connection&separation device, convenient to disassembly.During test,220kVStandard PT and step-up transformerintegrated equipmentcanbemovedfromfront to backbyhydraulic.Strong current generatoris in the right middle of cabin, where has a transferring door.Standard CT is in the back of cabin, when do error test for CT, it can be moved out to do test by small electric crane.
  2. Inside test trailer, there’s a test platform which have 500kV standard PTandstep-up transformerintegrated equipment. There’s a specialtrack(Steel tank structure)laying on the bottom plate oftrailer,andon thistrack, there’s a tray for placingstandard PT and step-up transformer integrated equipment.Betweenthetrack and tray, thereare special positioning device and fast connection&separation device, convenient to disassembly.During test,500kVStandard PT and step-up transformerintegrated equipmentcanbemovedfromfront to backbyhydraulic.
  3. In both of truck and trailer, all moving mechanismis set up with stop-gear to ensure the accurate place and fixing safetyof test equipment.After movement, it can meet with the safety insulation distance.
  4. whenauto-operationaccidentorfailure occurs,there’re alsocorresponding manual operation and emergencypower supplyon both of truck and trailer.
  5. Forsite error testof all kinds of 6kV-35kV PT,use0~70kVstep-up source and 6kV~35kVstandard PT, which are installed in 220kV test truck, but can be moved out to use by small electric crane.
  6. es have obvious marksand paste wiring diagram, schematic diagram and use instructions at corresponding position.
  7. In both of truck and trailer, there’s special electric transfer box on side wall. When test, just connect wires to corresponding terminals according to test requirements, then can do test.


在线联系供应商

至: CNME Intermational Co.Ltd
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

SF6 reference Capacitor - 400kV 50pF compressed gas standard capacitor
SF6 reference Capacitor - 400kV 50pF compressed gas standard capacitor Genneal Information: Compressed air standard capacitor is a necessary instrument in every HV test lab. It is used to measure the capacitance of cap...
Single phase 6 position test system for energy meter calibration
Single phase 6 position test system for energy meter calibration Single phase 6 position test system for energy meter calibration single phase energy auto-calibration system is a new generation, high precision e...
500kV Mobile Lab for CT/VT measurement test
500kV Mobile Lab for CT/VT measurement test 500kV Mobile Lab for CT/VT measurement test 500kVCT&PTmobile labis made up ofa truck for 220kV CT&PT error test, a 500kV van-typetrailer,te...
impulse Current test system
impulse Current test system impulse Current test system Impulse Current Test Systems are manufactured for testing equipment applied in medium and high voltage transmission &am...
DC voltage test system
DC voltage test system DC voltage test system DC test systems are used to test components and complete systems found in electrical power supply systems and operating on D...
供应产品

Same products

5G WiFi Wireless Router  D7341
5G WiFi Wireless Router D7341 卖方: Guangzhou DSPPA Audio Co., Ltd. 5G Wireless Router D7341 Adopt WPA / WPA2 digital encryption technology ensures conference pr...
4K DISTRIBUTION MATRIX SYSTEM  DIM002
4K DISTRIBUTION MATRIX SYSTEM DIM002 卖方: Guangzhou DSPPA Audio Co., Ltd. Integrated efficient environmental management module, which can control lighting, air conditionin...
4K 8x8 Audiovisual Matrix Switcher
4K 8x8 Audiovisual Matrix Switcher 卖方: Guangzhou DSPPA Audio Co., Ltd. M4K08 Fully adopt FPGA programmable logic array for signal processing and full switching, in R...
4K 72x72 Audiovisual Matrix Switcher
4K 72x72 Audiovisual Matrix Switcher 卖方: Guangzhou DSPPA Audio Co., Ltd. Fully adopt FPGA programmable logic array for signal processing and full switching, in RGB444 f...
4K 36x36 Audiovisual Matrix Switcher
4K 36x36 Audiovisual Matrix Switcher 卖方: Guangzhou DSPPA Audio Co., Ltd. Fully adopt FPGA programmable logic array for signal processing and full switching, in RGB444 f...