Lining trolley plug steel template
During the pouring process of the second lining concrete, one side of the two ends of the trolley is in contact with the already formed concrete, and it is not necessary to block, and the other side is empty, and a plug template is required.
The secondary lining plug template must have sufficient strength, stiffness and stability. After the lining trolley is positioned, the plug template is installed. The core of the installation of the plug template is the positioning and installation of the buried waterstop.
...
Specific click to visit:
在线联系供应商
Other supplier products
| hydraulic system | The lining trolley hydraulic system is the power source for the trolley to complete the vertical mold and demoulding work. Except for the trolley t... | |
| Tunnel concrete maintenance formwork | The tunnel concrete maintenance formwork independently developed by our company is mainly composed of work bench, high pressure spray health syst... | |
| WATER CONSERVANCY AND HYDROPOWER LINING TROLLEY | WATER CONSERVANCY AND HYDROPOWER LINING TROLLEY ADVANTAGES Ensure that the strength of the water conservancy and hydropower lining trolley i... | |
| DOUBLE-TRACK RAILWAY LINING TROLLEY | Use: Double-track railway lining trolley is a special equipment that must be used in the secondary lining of the double-track railway tunnel constr... | |
| Hydraulic inverting bridge formwork | Hydraulic inverting bridge formwork solves the problems of inconvenient, poor adaptability, low efficiency and low safety protection facilities in ... |