Lining trolley plug steel template
During the pouring process of the second lining concrete, one side of the two ends of the trolley is in contact with the already formed concrete, and it is not necessary to block, and the other side is empty, and a plug template is required.
The secondary lining plug template must have sufficient strength, stiffness and stability. After the lining trolley is positioned, the plug template is installed. The core of the installation of the plug template is the positioning and installation of the buried waterstop.
...
Specific click to visit:
在线联系供应商
Other supplier products
| hydraulic system | The lining trolley hydraulic system is the power source for the trolley to complete the vertical mold and demoulding work. Except for the trolley t... | |
| Tunnel formwork bypass channel | The tunnel formwork channel is a non-standard product specially designed and manufactured for the concrete lining of water tunnels such as tunnels ... | |
| Lining trolley plug steel template | During the pouring process of the second lining concrete, one side of the two ends of the trolley is in contact with the already formed concrete, a... | |
| Secondary grouting machine | Secondary grouting machine technology to take holes in the center line of the lining trolley vault, install the fixing flange and the positioning f... | |
| Tunnel waterproof board laying formwork | Tunnel waterproof board laying formwork is a non-standard product specially designed and manufactured for the lining of various tunnels and culvert... |















