.

Wheeled hydraulic inverting bridge formwork

Wheeled hydraulic inverting bridge formwork consists of seven parts: front axle, main bridge, rear axle, front bracket, rear bracket, travel drive and walking bracket.

Wheeled hydraulic inverting bridge formwork The concrete construction under the front approach bridge allows the vehicle to pass through the trestle bridge to the lower step from the filling layer, perfectly matching the concrete construction of the inverting arch (floor) under various step method excavation methods to achieve early closure. Construction requirements for early ring formation.

ADVANTAGE

The span of the trestle bridge is large, and it can meet the one-time concrete pouring of the inverted arch of 12 meters and 24 meters, which greatly improves the speed of the invert arch construction.

The strength of the trestle is high, and it can safely pass all kinds of construction vehicles with a weight of not more than 60 tons.

The space above the trestle is wide, which is convenient for the passage of various construction vehicles. The concrete tanker can conveniently pour the concrete on both sides of the trestle. The excavator can also swing on the trestle without any obstacles, which is convenient for cleaning the residual slag.

All the components of the trestle are hydraulically driven, which work smoothly and have high reliability.

Click to visit:



在线联系供应商

至: Luoyang Gaofei Bridge Tunnel Machinery Co., Ltd.
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

Lining trolley plug steel template
Lining trolley plug steel template During the pouring process of the second lining concrete, one side of the two ends of the trolley is in contact with the already formed concrete, a...
hydraulic-cylinder
hydraulic-cylinder The hydraulic cylinder is mainly divided into a lift cylinder, a translation cylinder and a side mold cylinder. The role of the Hydraulic cylinder ...
Tunnel concrete maintenance formwork
Tunnel concrete maintenance formwork The tunnel concrete maintenance formwork independently developed by our company is mainly composed of work bench, high pressure spray health syst...
Tunnel lining concrete grouting device
Tunnel lining concrete grouting device The main function of the tunnel lining concrete grouting device is to transport the concrete through the pressure of the high-pressure concrete con...
Single-track railway lining trolley
Single-track railway lining trolley Single-track railway lining trolley is a special equipment that must be used in the secondary lining of single-track railway tunnel construction. I...
供应产品

Same products

Scanners for Retailing Cashing & Business Payment
Scanners for Retailing Cashing & Business Payment 卖方: Suzhou Supermax Smart System Co., LTD. Scanners for Retailing Cashing & Business Payment Catering, retail, logistics, and the choic...
Scanners for Logistics & Express
Scanners for Logistics & Express 卖方: Suzhou Supermax Smart System Co., LTD. Scanners for Logistics & Express From the initial "container stage", through the "pallet sta...
Find Barcode Scanner Solution in Superlead
Find Barcode Scanner Solution in Superlead 卖方: Suzhou Supermax Smart System Co., LTD. Find Barcode Scanner Solutionin Superlead Scanners for Urban Traffic & Self-service Urban...
Superlead Wireless Barcode Reader&Scanner
Superlead Wireless Barcode Reader&Scanner 卖方: Suzhou Supermax Smart System Co., LTD. For added flexibility, Superlead wireless barcode scanners deployed the wireless variants feature...
Superled 7161WP IP54 Water Proof Embedded 2D Barcode Scanner
Superled 7161WP IP54 Water Proof Embedded 2D Barcode Scanner 卖方: Suzhou Supermax Smart System Co., LTD. Superled 7161WP IP54 Water Proof Embedded Barcode Scanner 7161 is the standard version 7161...