.

High speed conventional heavy duty lathe price

High speed conventional heavy duty lathe price

This machine tool belongs to heavy machine tool,the maximum weight is 16 tons, adopt the rectangular guide rail, can be able to cut the end section of all kinds of parts,outer circle, inner hole and metric system, English system, modulus, state thread.

C61125 160 180 200 (16T)

Main configuration:

StandardConfiguration:

1. Bed rail width 1100,Two top-load bearing 16 tons

Optionalconfigure:

1. Double saddle add another 80,000.

2. Roller additional price of 25,000 yuan

n

Technical Parameters

UNIT

C61180

CAPACITIES

Swing over bed

mm

1800

Swing over carriage

mm

1450

Max.length of workpiece

mm

3000-12000

Max.turning length

mm

2800-11800

Pan of guideway

mm

1100

Spindle nose

mm

A2-15

Spindle bore

mm

100

Taper hole of spindle

Metric140

Range of spindle speeds

r/min

Forward:3.15~315;Reverse:3.5~291

SPINDLE

No.of spindle speeds

Forward:21; Reverse:12

No.of Longitudinal and cross

56/56

Feed per revolution

mm

Longitudinal:0.1~12;Transverse:0.05~6;Up turret:0.025~3

No. and range of metric thread

44;1~120mm

No. and range of inch thread

31;28~1/4″

No. and range of module thread

45;0.5~60mm

TAILSTOCK

No. and range of dia. thread

38;1/2~56DP

Distance of centerline and tool resting plane

mm

53

Tool post swing range

°

±90°

Max.travel of cross slide

mm

900

Max.travel of top slide

mm

360

Section of tool shank

mm

50(380x380)

Travel of tool post (per turn of dials)

mm

0.05(0.002″)

OTHERS

Dia. of tailstock

mm

260

Travel of tailstock quill

mm

300(12″)

Taper hole of tailstock quill

Metric80

Main motor power

kw

30

Length

mm

6120-15120

Width

mm

2058-2580

Max.weight of workpiece

t

16

Detailed Images

5

Accessories

When the gear and gear ring are engaged, the four locking claws are connected, synchronously and at the same time, can hold the circular workpiece.When the gear and gear ring are separated, the four claws are independent, which are the same as the original four-jaw chuck.

Tail frame:mounted on the bed guide rail and moved vertically along this guide rail to adjust its position. The tail frame is mainly used to install the top, to support the long work piece, also can install the drill bit, reamer and so on the hole processing.

b

FAQ

1. FOB Shanghai / Tianjin or CIF, LCL or FCL shipping.

2. Payment terms: T/T or other ways contact us.

3. Package: standard wooden case

4. Delivery time: Within 20 working days after the down payment. (Actual delivery time depends on actual order.

2. Check the acceptance


Receive machine,please check:

1. Examine the content of the packing list,the product quantity to both consistent,and accessories;

2. Machine tool details if they 're normal, If have the trace of replacement and maintenance, If have other effects use of the problem.

If happens above declare,please contact us immediately.

Our Services

8
Certifications

Contact Us

contact us1.jpg


在线联系供应商

至: Anyang Xinheng Machine Tool Co.,Ltd.
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

tube forming press
tube forming press DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by usi...
upsetter forging machine
upsetter forging machine DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by usi...
sucker rod upsetter
sucker rod upsetter DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by usi...
Swing over bed C61200 heavy duty lathe with good service
Swing over bed C61200 heavy duty lathe with good service Swing over bed C61200 heavy duty lathe with good service This machine tool belongs to heavy machine tool, the maximum weight is 16 tons, adopt t...
drill pipe upsetter equipment
drill pipe upsetter equipment DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by usi...
供应产品

Same products

GT-FM24-PLC填粉机机(3+9+9+3)三导管
GT-FM24-PLC填粉机机(3+9+9+3)三导管 卖方: 肇庆古雷特科技有限公司 * 描述 GT-FM-PLC(6-48工位三导管)氧化镁粉灌装机,是在GT-FM-PLC(6-48工位双导管)的基础上改进而成。 双导管灌装机与三导管灌装机的主要区别如下: 三导管灌装机可以在一...
High Speed Flat Wire Coil Winding Machine for EV Traction Motor Manufacturing
High Speed Flat Wire Coil Winding Machine for EV Traction Motor Manufacturing 卖方: Eurion Automation Co., Ltd. 高精度伺服控制系统:采用工控级电脑控制平台,配套进口伺服电机与减速机,确保运行高效、精准、稳定。 六轴联动结构设计:送线轴、绕线轴、排线轴及手臂成型轴独立控制、协同配合,实现多工序复合成型。 ...
GT-FM18-PLC灌装机(8+2+8)三导管
GT-FM18-PLC灌装机(8+2+8)三导管 卖方: 肇庆古雷特科技有限公司 * 描述 GT-FM-PLC(6-48工位三导管)氧化镁粉灌装机,是在GT-FM-PLC(6-48工位双导管)的基础上改进而成。 双导管灌装机与三导管灌装机的主要区别如下: 三导管灌装机可以在一...
48工位填粉机 GT-FM48
48工位填粉机 GT-FM48 卖方: 肇庆古雷特科技有限公司 * 描述FM灌装机适用于长长度、不同直径的管式加热器的灌装。 FM填充机填充的加热器具有高密度,根据直径、氧化镁粉末、填充速度,密度可达2.3g/cm3。 FM灌装机有双导管灌装机和三导管灌装机...
8工位填粉机 GT-FM8
8工位填粉机 GT-FM8 卖方: 肇庆古雷特科技有限公司 * 描述 FM灌装机适用于长长度、不同直径的管式加热器的灌装。 FM填充机填充的加热器具有高密度,根据直径、氧化镁粉末、填充速度,密度可达2.3g/cm3。 FM灌装机有双导管灌装机和三导管灌装...