Mould Component
Mould Componentare also a part of the mould.GM-TECH not only produces precision moulds but also provides customers with high-precision, low-cost mould parts. For example mould cores, inserts, sliders, lifter, wear plates, ejector pins, etc. Usually, processing accuracy can be controlled within + /-0.015mm. Delivery time is 2-3 weeks, DHL or FedEx will take about 3 days for shipping.
All the steel and tolerances of the parts are processed according to the drawings of the customers. In order to ensure the quality of parts processing, we will provide customers with dimensional measurement report, hardness measurement report, material proof.
We also use new technology to do DLC surface treatment to guarantee the life of the parts.
Mould Component Features
All the steel and tolerances of the parts are processed according to the drawings of the customers. In order to ensure the quality of parts processing, we will provide customers with dimensional measurement report, hardness measurement report, material proof.
We also use new technology to do DLC surface treatment to guarantee the life of the parts.
Injection mold componentsare also a part of the mould.GM-TECH not only produces precision moulds but also provides customers with high-precision, low-cost mould parts. For example: mould cores, inserts, sliders, lifter, wear plates, ejector pins, etc. Usually, processing accuracy can be controlled within + /-0.015mm. Delivery time is 2-3 weeks, DHL or FedEx will take about 3 days for shipping.
All the steel and tolerances of the parts are processed according to the drawings of the customers. In order to ensure the quality of parts processing, we will provide customers with dimensional measurement report, hardness measurement report, material proof.
We also use new technology to do DLC surface treatment to guarantee the life of the parts.
Mould Component FAQs
What is the tolerance of parts?What is the tolerance of parts?
If the customer does not have special requirements, the processing is generally within + / - 0.02mm.
How long is the delivery time for mold part processing?How long is the delivery time for mold part processing?
Specific to see the difficulty of part, generally1-2 weeks.
How many days does it take to send parts to Germany?How many days does it take to send parts to Germany?
The fastest DHL express delivery in Europe usually takes about 3 days to reach each country in Europe, while FedEx in the United States usually takes about 3 days to arrive.
GM-TECH is a professional injection moulding products manufacturers, we provide plastic injection molded part, precision mold components, plastic parts injection molding, metal insert molding, plastic injection mold components, plastic mold componentsand etc. Want to know more? Please contact us.
在线联系供应商
Other supplier products
| Multi Cavity Mould | A multi cavity moldis known as a mould with multiple cavities. The multi-cavity mold consists of a multi-cavity of different plastic parts. Thou... | |
| Die Casting Mould | Die casting mould is a method of casting liquid die forging. It is a process completed in a special die casting moulding machine. The major adva... | |
| Die Casting Mould | We are a plastic injection manufacturer. In the spirit of a "one-stop-shop", our own tool workshop as well as an assembly and an international sale... | |
| Electronics Product Part | Electronics Product Part With the fast growth in the electronic industry, the demand for injection molding electronicsis much higher. The injectio... | |
| Insert Mould | Insert molding is an injection molding process used to encapsulate a component in a plastic part. The insert custom plastic injection moldingpro... |













