Floating Hose Inspection, Displace, Installation
Timeast performed many CNOOC QHD32-6、CFD11-2 and JZ9-3 offshore oil fieldfloating inspection and displacement project.
Other supplier products
|
Roc Oil Zhaodong Oil Field Cable Repairing (Year 2012) |
Project Introduction: Subsea cable of P4-CEP and P3-CEP broke need to be repaired emergently.
Work Scope:, fault point searching and checking, c... |
|
Tincy Energy Group Yuedong Oil Field Submarine/Offshore Cable Repairing (Year 2014) |
Project Introduction:Yuedong Oil Field, A and B cable between island and onshore broke, need to be repaired emergently.
Work Scope:, fault point... |
|
Huludao Submarine/Offshore Optical Cable Laying (Year 2017) |
Project Introduction:Approximate 13km submarine/offshore cable laying (including landing installation at both ends) , submarine/offshore cable c... |
|
Philippines 20MW [Net] Steam Turbine Genset Project (Year 2017-2018) |
Project Introduction:20MW [Net] Steam Turbine Genset Project is located in Lafarge cement plant in Iligan, North Mindanao, Philippines. The cons... |
|
JZ9-3 Oil Field Platform Anti-Icing Design, Fabrication and Installation (Year 2009) |
Project Introduction:JZ9-3 oil field Jacket anti-icing destroyed seriously.
Work Scopeof :Structure re-design, fabrication, site installation, c... |
供应产品
Same products