300 ton bridge erecting cranes beam launcher machine for subway bridge construction
Product Description
300 ton bridge erecting cranes beam launcher machine
300 ton bridge erecting cranes beam launcher machineis used in the erection of precast beam bridges for span by span method of construction for precast beam girders like T beam, U beam, etc. This self-beam launcher is suitable for bridge construction over river, valley or highway and so on.
300 ton bridge erecting cranes beam launcher machineis suitable for the construction of bridge for roads, railways and other bridge erection construction site. Its main function is to lift the prefabricated beams, then transported onto the prefabricated pier. It has big difference from the general cranes. It requests high security.
Packing
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying.
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.
Delivery
1. If the size of300 ton bridge erecting cranes beam launcher machineare suitable for container ship, usually by container.
2. If the size is too big, usually by bulk ship or by container after truncation; Transport ways are based on reducing cost for you and keep the crane performance.
Delivery time
Within 30 to 40 working days after the receipt of deposit.
Transportation
Generally 35 days to 50 days to destination port.
FAQ
1. What’stheinformationshouldIprovidewheninquiry about the300 ton bridge erecting cranes beam launcher machine?
1.1 We need the Bridge Drawing, the Maximum longitudinal slope and the Maximum Transverse slope.
1.2 The Girder/beam drawing.
2.What are inspection standard for load test of 300 ton bridge erecting cranes beam launcher machine?
2.1 Dynamic load test
1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overheat.
2.2 Static load test
1.25 times rated load, all mechanisms work well, the crane stops 20-30 min as trial load is lifted 10 cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation;
3. How to make highway bridge concrete girders?
a. Full span prefabrication.
b. Segment girder prefabrication.
c. Full span cast-in-place girder.
d. Segment cast-in-situ.
4. How about maintenance of 300 ton bridge erecting cranes beam launcher machine?
4.1 Lubricating: Working performance and service life of all mechanisms of crane depend on lubricating to a big extent.
4.2 Steel wire rope: Fracture of wire has to be specially noticed. A new steel wire rope has to be changed immediately with the condition of broken wire, broken strands and wear loss to scrapping standard.
4.3 Spreader: The spreader has to be checked regularly.
4.4 Pulley block: Mainly check rope race wearing condition, check whether wheel flange is cracked and whether pulley could get stuck in the axle or not.
4.5 Wheels: Regularly check wheel flange and tread, a new wheel has to be immediately replaced as crack part or wearing in wheel flange reaches 10% of wheel thickness; Re-polishing has to be done as diameters between two driving wheels on tread differs more than D/600, or there are severe scar on the tread.
4.6 Brake: Check one time per shift; The brake should be in accurate movement, and pins do not allow to be stuck. Brake shoes shall fit brake wheels correctly; the brake shoes interval shall be equal to open them.
5. How many Personnel and equipment to assemble 300 ton bridge erecting cranes beam launcher machinein the worksite we need?
Personnel: 8 to 10 workers equipment
Truck crane > 50 t : 2 sets
Φ19.5 steel wire rope 8 m: 4 ropes
Sleepers: several
Electric welding machine: 1 set
Oxygen, acetylene: 1 set
Hammer(12 pound and 8 pound): 1 set for each
Wrench and pincher: several
Gradienter: 1 set
在线联系供应商
Other supplier products
| 800 ton underslung movable scaffolding system | 800 ton underslung movable scaffolding system is a fully self-supporting formwork system that builds the bridges with span-by-span cast-in-situ met... | |
| 双梁起重机重型设备控制驾驶室 | 双梁起重机重型设备控制驾驶室是针对起重机作业人员的具体情况而开发的,为驾驶员提供安全的场所、作业区域的充分可视性和舒适的工作环境。采用先进的焊接和制造工艺,对墙体和框架进行了精确的测量,使其外观光滑。门窗密封良好,防水防震。 1.我们有各种起重机驾驶室。 2.起重机驾驶室有操作椅。 3.起重机... | |
| 采用液压系统的1000T优质混凝土分段启闭龙门起重机 | 采用1000T混凝土分段启运龙门起重机施工预制跨度可达60m。它的设计和制造是为了保证高性能、高效率、安全性、灵活性和多次连续使用。 安全特性 1000T混凝土分段启闭门式起重机的安全问题是最重要的。为保证安全,在1000T混凝土分段启运龙门起重机上安装了以下安全装置。 ▪起重机移动限位开关。... | |
| beam launcher bridge building equipment | Beam LauncherMain Features ◆ The beam Launcher has many advantages, such as light weight, high stiffness, low deflection, and high wind-resistance... | |
| 定制龙门大梁施工下挂活动脚手架系统 | 产品描述 高架和悬挂式MSS都由一个自支撑结构和一个特定于项目的外部模板组合而成。龙门梁结构下悬式活动脚手架系统,适用于双T型到单箱、跨度20米到70米不等的截面。 我国龙门大梁施工下挂活动脚手架系统多年来的发展,源于降低我国施工人力成本的需要。今天,我们的现浇桥梁MSS可以为您的桥梁建设项目... |
Same products
| XX1300 Hydralic Pressing Machine | 卖方: Quanzhou Kimberly Machinery Manufacturing Co. Ltd | Product Overview Processing Brick molding machine Place of origin Fuj... | |
| Juli's Rugged Automotive Racks | 卖方: Shandong Juli Storage Equipment Co., Ltd. | Automotive bumper racksare generally welded from square tubes, angle steel, round tubes and other... | |
| O-Ring A suitable for SANY Dump Truck | 卖方: DURATECH INDUSTRIAL GROUP LIMITED | ORTEC provide the SDLG Parts,LGMG Parts,Sany Parts,LiuGong Parts, and all China brands Constructi... | |
| Filter element 60345316 suitable for SANY SRT95C | 卖方: DURATECH INDUSTRIAL GROUP LIMITED | Filter element60345316suitable forSANY Dump Truck Model: SRT95C DESCRIPTION Filter elemen... | |
| SANY parts Headlight Assembly A for SRT95C | 卖方: DURATECH INDUSTRIAL GROUP LIMITED | Headlight AssemblyAsuitable forSANY Dump Truck Model: SRT95C DESCRIPTION Headlight Assemb... |












