.

Compact 200 Bridge

1.Structure bailey  bridges 2.conveniently Transported3.rapid erection/easy assembled/fast installed 4 huge load5.Long service life6.strong corrosion resistanceBailey Bridge is a standard bridge equipment, adopted extensively and the most popular in the world, possessing the features of simple structure, convenient transport, speedy erection and easy disassembling, while having the advantage of heavy loading capacity, great stability and long fatigue life being capable of an alternative span, loading capacity and mixture form to erect all kinds of Temporary Bridges, Emergency Bridges and Fixed Bridges. Using the bridge equipment, the suspension bridges of varied span can be erected. The bridge has the advantages of few components, light weight and low cost. Bailey bridge is similarly like compact 100,compact 200 International bridge. It is assembled by each 3m panel, and invented by Donald Bailey. The 321 panel bridge can be easily dissembled and rapidly erected. The whole bridge is made by high-tensile strength steel. Main beam is light weight panels and the panels are connected by panel connection pins. It is easy to assemble or disassemble and transport. It can also be assembled into different forms of panel bridges according to their span length and transportation requirement. So, it has been widely applied as emergency transportation, temprary or permanent bridge.Its suitable load design is such like HS-15, HS-20, HS-25 and pedrail-50 etc.Bridge usage & maintenanceFollowing maintenance measures shall be adopted while using the bridge.(I) Signs on bridgehead  Traffic signs shall be set on both bridgeheads, showing load level, speed limit, etc., with strict precaution against overload. If necessary, adopt compelling measures for load and speed limit. (II) Regular inspection and maintenance, which shall include1. Check regularly various pins, bolts, beam clamps and sway braces, so as to maintain in a proper status.2. Check regularly whether there is any uneven sedimentation to the bed plate of girder and block of bridge approach, and deal with any problems immediately. 3. Smear grease around the pin for preventing rainwater from entering the aperture of pinhole. Smear grease around the outer part of bolt for preventing against rust.4. Measure regularly the midspan deflection for finding whether there is gradual enhancement. The speed of deflection enhancement shall be in direct proportion with the wearing degree of pin and pinhole, and the enhancing degree shall be very small. If the speed of deflection enhancement is too fast, it shows that there’s damage to pin, pinhole, upper or lower truss chord member (including reinforced chord member), therefore, detailed inspection shall be made for adopting measurement. 5. Check regularly whether there is any crack to the male end of lower truss chord member. If there is any, measure the length of crack, and take monitoring measurements for preventing the truss from damaging, and replace the truss in time. 6. Check regularly whether there is any fracture, curve or unevenness to bridge plate. Replace the damaged immediately. If there is frequent pass of creeper truck on the bridge, track plate should be paved for avoiding fast abrasion.7. Bridge components or accessories, except the touching parts, have painted two coats of paint. For long usage and protecting the steel material, the best thing would be to paint all one coat after erecting the bridge. Some components need pre-paint before erection.       8. Clean the bridge deck regularly.



在线联系供应商

至: Jiangsu Bailey Steel Bridge Co.,Ltd
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

Compact 200 Bridge
Compact 200 Bridge 1.Structure bailey  bridges 2.conveniently Transported3.rapid erection/easy assembled/fast installed 4 huge load5.Long service life6.strong corrosi...
CB100 bailey Panel Pin and Pin Clips1 Bailey Bridge Component for connecting bailey panelFor connecting trusses. There is one circular hole in one ...
Specifications1 To support Bailey decking System 2 Bailey Transom 3 Made of H-steel 4 Galvanize to protect the surface On the transom, t...
Metal Bridge Panel
Metal Bridge Panel metal panelFormwork is a type of board which is used to hold wet concrete as it dries. It is a temporary structure made of wood or steel. The Formw...
Bridge Bearing Pad
Bridge Bearing Pad SpecificationsHigh quality cheap  bridge bearing pad 1. NR, CR, NBR, SBR, VITON, EPDM, HNBR, SILICONE, BUNA, 2. ISO9001 MaterialsNR, NBR...
供应产品

Same products

Forging Parts For Construction Machinery
Forging Parts For Construction Machinery 卖方: 青岛中旺新润工贸有限公司 Forging Parts For Construction Machinery,Forging Parts
Forging Parts For Agricultural Machinery
Forging Parts For Agricultural Machinery 卖方: 青岛中旺新润工贸有限公司 Forging Parts For Agricultural Machinery,Website: Parts
Forging Parts For Mining Machinery
Forging Parts For Mining Machinery 卖方: 青岛中旺新润工贸有限公司 Forging Parts For Mining Machinery,Website: Parts
Stainless Steel Forging Parts
Stainless Steel Forging Parts 卖方: 青岛中旺新润工贸有限公司 Stainless Steel Forging Parts,Website: Parts
Iron Forging Parts
Iron Forging Parts 卖方: 青岛中旺新润工贸有限公司 Iron Forging Parts,Website: Parts