.

Bridge Bearing Plate

Specifications1 Bailey Bridge Component 2 Receive the Press Power from the girder 3 Helpful to the Bridge Locating on AbutmentIt is used for setting bridge chair, and distributing evenly the load to groundwork. The letter 1, 2 & 3 marked on the bed plate represent respectively the bridge chair center-line positions of single-row, dual-row and triple-row. On the other side of the bed plate is marked the center-line position of span bridge direction.Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes.  Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.



在线联系供应商

至: Jiangsu Bailey Steel Bridge Co.,Ltd
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

Specifications1,attractive appearance, convenient installation, robustness, 2,good anti-corrosive property1) Ball-joint rail have advantages such a...
Specifications1 To support Bailey decking System 2 To connect chords and panels 3 Commonly used in steel bridge 4 Bailey bridgePanel bolt used to c...
Specialized Brace
Specialized Brace specialized braceNoABCweight(KG)MG 21*1.53.3MG  21*1.52.92MG  21*1.52.59MG  21*1.53.06MG  21*1.52.67MG  21*1.52.3MG  21*1.52.89MG  21*1.52.47MG  21...
Specifications1.multi-purpose formwork 2.high tensile steel panel 3.economy cost 4.accuracy dimensionEconomy steel formwork panel is the most advan...
Compact 200 Bridge
Compact 200 Bridge 1.Structure bailey  bridges 2.conveniently Transported3.rapid erection/easy assembled/fast installed 4 huge load5.Long service life6.strong corrosi...
供应产品

Same products

Forging Parts For Construction Machinery
Forging Parts For Construction Machinery 卖方: 青岛中旺新润工贸有限公司 Forging Parts For Construction Machinery,Forging Parts
Forging Parts For Agricultural Machinery
Forging Parts For Agricultural Machinery 卖方: 青岛中旺新润工贸有限公司 Forging Parts For Agricultural Machinery,Website: Parts
Forging Parts For Mining Machinery
Forging Parts For Mining Machinery 卖方: 青岛中旺新润工贸有限公司 Forging Parts For Mining Machinery,Website: Parts
Stainless Steel Forging Parts
Stainless Steel Forging Parts 卖方: 青岛中旺新润工贸有限公司 Stainless Steel Forging Parts,Website: Parts
Iron Forging Parts
Iron Forging Parts 卖方: 青岛中旺新润工贸有限公司 Iron Forging Parts,Website: Parts