Tunnel concrete maintenance formwork
The tunnel concrete maintenance formwork independently developed by our company is mainly composed of work bench, high pressure spray health system, water tank bottom beam and electric walking system.
Tunnel lining is generally treated by natural curing or water spray curing. It is greatly affected by the external environment and human factors, and it is difficult to achieve good curing effect. Tunnel concrete maintenance formwork is a special curing equipment developed to solve the maintenance difficulties. The tunnel concrete maintenance formwork independently developed by our company effectively solves the problem that the tunnel section is tubular, the inner wall is not easy to be wet, and the health is difficult, which greatly improves the tunnel construction progress and work efficiency. The maintenance trolley has obtained national invention patents and a number of new patents, and has been widely used in many major projects across the country, and has been well received by customers.
...
For more information about Tunnel concrete maintenance formwork, please click to visit:
在线联系供应商
Other supplier products
| hydraulic crawler hydraulic inverting bridge formwork | Inverted arch construction is a key process of construction efficiency and quality control. In order to reduce the interference of the inverting ar... | |
| DOUBLE-TRACK RAILWAY LINING TROLLEY | Use: Double-track railway lining trolley is a special equipment that must be used in the secondary lining of the double-track railway tunnel constr... | |
| TWO-LANE HIGHWAY LINING TROLLEY | TWO-LANE HIGHWAY LINING TROLLEY CAN ACHIEVE THE EFFECT OF ENGINEERING LINING (1) When the tunnel excavation is off-center, it can be adjusted by t... | |
| Lining trolley plug steel template | During the pouring process of the second lining concrete, one side of the two ends of the trolley is in contact with the already formed concrete, a... | |
| Tunnel formwork bypass channel | The tunnel formwork channel is a non-standard product specially designed and manufactured for the concrete lining of water tunnels such as tunnels ... |
Same products
| AEMK 588 Loader | 卖方: 烟台欣祥国际贸易有限公司 | 驾驶室高度:2670毫米 整车尺寸(长*宽*高):5700*2000*2670毫米 前轮配重:4250毫米 轴距:2500毫米 离地间隙:480毫米 最大卸料高度:3500毫米 最大... | |
| Quick Change Worktable | 卖方: Nextas Co.,Ltd | Quick Change Worktable Zero Point Pneumatic Chuck Zero Point Positioning Datum System NE... | |
| Self Centering Vise | 卖方: Nextas Co.,Ltd | Self Centering Vise Key Advantages High precision: repeatability as tight as ≤ 0.005 mm ... | |
| BDS Positioning Chuck | 卖方: Nextas Co.,Ltd | BDS Positioning Chuck Self Centering Vise Self-centering vise is a type of workholding tool that... | |
| Quick Change Pallet System | 卖方: Nextas Co.,Ltd | Quick Change Pallet System Quick Change Pallet System Quick Change Pallet System delivers m... |
















