Tunnel formwork bypass channel

The tunnel formwork channel is a non-standard product specially designed and manufactured for the concrete lining of water tunnels such as tunnels and culverts. It has the functions of vertical mold and demoulding function, high surface finish of lining and fast lining speed. The working process of the steel formwork trolley is carried out in the following steps:

FIRST, CHECK WHETHER THE TUNNEL CONSTRUCTION CONDITIONS MEET THE DESIGN REQUIREMENTS OF THE TEMPLATE TROLLEY:

Since the formwork trolley is a non-standard equipment, the conditions of use must meet the design requirements before lining.

Check whether the road surface elevation and road surface condition meet the design requirements, the road surface elevation: as shown in the figure; the road surface condition: concrete road surface;

Check whether the sleepers and rails meet the design requirements;

Check whether the outer surface of the steel formwork is coated with a release agent.

Click to visit:


在线联系供应商

至: Luoyang Gaofei Bridge Tunnel Machinery Co., Ltd.
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

hydraulic-cylinder
hydraulic-cylinder The hydraulic cylinder is mainly divided into a lift cylinder, a translation cylinder and a side mold cylinder. The role of the Hydraulic cylinder ...
Tunnel concrete maintenance formwork
Tunnel concrete maintenance formwork The tunnel concrete maintenance formwork independently developed by our company is mainly composed of work bench, high pressure spray health syst...
Lining trolley hydraulic system
Lining trolley hydraulic system The lining trolley hydraulic system is the power source for the trolley to complete the vertical mold and demoulding work. Except for the trolley t...
tunnel lining formwork
tunnel lining formwork Tunnel lining formwork is a non-standard product specially designed and manufactured for concrete linings of various tunnels, culverts and other se...
Tunnel lining concrete grouting device
Tunnel lining concrete grouting device The main function of the tunnel lining concrete grouting device is to transport the concrete through the pressure of the high-pressure concrete con...
供应产品

Same products

Automated Parallel Concentrator ORAS-12
Automated Parallel Concentrator ORAS-12 卖方: Beijing Orun Scientific Instrument Co., Ltd. Automated Parallel Concentrator ORAS-12 The direction of the blow needle is adjustable. Nitrogen...
R6 Distiller
R6 Distiller 卖方: Beijing Orun Scientific Instrument Co., Ltd. R6 Distiller R6 DistillerFeatures •Unattended: The Sample Preparationsystemautomatically c...
Optima-6 Distiller
Optima-6 Distiller 卖方: Beijing Orun Scientific Instrument Co., Ltd. Optima-6 Distiller The system automatically completes heating, peeling, temperature control, dis...
OIC-M1 Ion Chromatography
OIC-M1 Ion Chromatography 卖方: Beijing Orun Scientific Instrument Co., Ltd. OIC-M1 Ion Chromatography OIC-M1 modular high-end ion chromatography systemis engineered for pre...
OIC 610 Ion Chromatography
OIC 610 Ion Chromatography 卖方: Beijing Orun Scientific Instrument Co., Ltd. OIC 610 Ion Chromatography The OIC-610 Basic Ion Chromatographfeatures advanced separation techn...