Green Formwork Steel panel-prop system with early stripping mechanism
Green Formwork is an advance Panel -Prop formwork system which allow EARLY STRIPPING PROCESS. It provides a suitable formwork solution to most concrete structure and component and meets the general requirements of different construction methods and conditions.The system adopts the structural mechanism of a 4-leg table using puzzle-style & systematic installation approach.
Other supplier products
|
|
Aluminium X Frame System by Qingdao Scaffolding |
Shandong, China (Mainland) Brand name: QS Model number: Alu X frame Material: Aluminium Qingdao Scaffolding Co., Ltd. is the biggest manufacturer a... |
|
|
Steel and Aluminum Green Formwork with early stripping system for slab concrete |
Green formwork is a simple panel&prop system with early stripping mechanism,it consists only of three basics components: 1.the steel of alumini... |
|
|
High quality Q345 and Q235 steel galvanized ringlock scaffolding parts |
The universal scaffolding system QSRound is constructed by prefabricated steel components. Standards, ledgers, U-transoms, and diagonal braces that... |
|
|
Green Formwork Aluminium Slab Formwork for No Beam or Less Beam Structure |
Green formwork is a simple panel&prop system with early stripping mechanism,it consists only of three basics components: 1.the steel of alumini... |
|
|
QSRound Universal Scaffolding with Load Class 2-6 |
The universal scaffolding system QSRound is constructed by prefabricated steel components. Standards, ledgers, U-transoms, and diagonal braces that... |
供应产品
Same products