.

Electric Arc Furnace Waste Heat Recovery Boiler

Electric Arc Furnace Waste Heat Recovery BoilerNecessitySteel & iron making accounts for 12% ~ 15% of the entire domestic energy consumption annually,Website:, and around 10% of this huge production comes from EAF (2009). The dust-laden flue gas temperature is approximately 1000℃ ~ 1450℃ which has been traditionally treated by series of water-spraying to lower its temperature down to 130℃. This traditional method requires extra energy input and leads to a tremendous water wastage, for which a quality waste heat recovery system is a responsible choice to make. Design IngenuityBoth flue gas quantity and temperature emanating from the EAF fluctuate along with the smelting cycle. Moreover, gas contains a large portion of dust particles, rendering heat surface (heat exchange surface) susceptible to fraction. Our heat surface area employs a unique multi-free-end-surface design, meaning that the heat surface is able to stretch flexibly within a safe interval as the heat expansion frequently takes its place. Our boiler is also designed with optimal flue gas velocity to ensure the long lifespan of the entire heat surface. The average investment recovery period is 3 to 4 years. Key Parameters1 T of steel production = 150 KG ~ 250 KG of steam output Applicable furnace capacity: 70 T ~ 350 T Rated operating pressure: 1.0 MPA ~ 3.0 MPAPROJECT EAF WASTE HEAT RECOVERY FOR:JIANGSU YONGGANG GROUP CO., LTD. (YONG-STEEL)Rated steam pressure: 3.0 MPA Working steam pressure 1.2 MPA ~ 1.6 MPA Rated steam temp: 235.7 Deg Celsius (saturated temp)1 T of steel production = 180 KG of steam output


在线联系供应商

至: JSDJ HEAVY INDUSTRY CO., LTD.
Your E-mail:
消息正文:


Send to other suppliers

Other supplier products

18.Boiler Membrane Wall Boiler membrane wall sections are processed with automatic submerged arc welding technology and pipe panels are adjusted by...
Boiler HeaderThe plasma flame cutting technology is used to process the intersecting line of boiler header nozzles. This cutting machine is able to...
Pyrite Roasting Waste Heat Recovery BoilerNecessitySulfuric acid is one of the most important raw material for many industries,Website:, and a nati...
Spent Acid Waste Heat BoilerNecessitySulfuric acid is one of the most important raw material for many industries,Website:, and a nation's sulfuric ...
Sulfur BurnerWaste Heat Recovery BoilerNecessitySulfuric acid is one of the most important raw material for many industries,Website:, and a nation'...
供应产品

Same products

2BV6161 Liquid Ring Vacuum Pump
2BV6161 Liquid Ring Vacuum Pump 卖方: Greentech International (Zhangqiu) Co., Ltd 2BV6161 Liquid Ring Vacuum Pump2BV series liquidring vacuum pumps are suitable for pumping the ga...
2BV6131 Liquid Ring Vacuum Pump
2BV6131 Liquid Ring Vacuum Pump 卖方: Greentech International (Zhangqiu) Co., Ltd 2BV6131 Liquid Ring Vacuum Pump2BV series liquidring vacuum pumps are suitable for pumping the ga...
2BV6121 Liquid Ring Vacuum Pump
2BV6121 Liquid Ring Vacuum Pump 卖方: Greentech International (Zhangqiu) Co., Ltd 2BV6121 Liquid Ring Vacuum Pump2BV series liquidring vacuum pumps are suitable for pumping the ga...
2BV6111 Liquid Ring Vacuum Pump
2BV6111 Liquid Ring Vacuum Pump 卖方: Greentech International (Zhangqiu) Co., Ltd 2BV6111 Liquid Ring Vacuum Pump2BV series liquidring vacuum pumps are suitable for pumping the ga...
2BV5161 Water Ring Vacuum Pump
2BV5161 Water Ring Vacuum Pump 卖方: Greentech International (Zhangqiu) Co., Ltd 2BV5161 water ring vacuum pump2BV series liquidring vacuum pumps are suitable for pumping the gas...